Jemez Electric Cpf50 #1
AvailableEV charging station in Hernandez, New Mexico on the ChargePoint network — 1 Level 2. US DOE AFDC station 252592.
At a glance
Jemez Electric Cpf50 #1 is a public EV charging station at 19365 US-84 in Hernandez, New Mexico, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 252592 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 19365 US-84
- City
- Hernandez
- State
- New Mexico
- ZIP
- 87537
- Coordinates
- 36.04534, -106.10955
Within ~15 km
Nearby charging
- Plaza de Espanola2 ports
Red E · Available
- Avanyu Avanyu Left1 ports
ChargePoint · Available
- Avanyu Avanyu Right1 ports
ChargePoint · Available
- Jemez Electric Cpe250 #11 ports
ChargePoint · Available
What kind of charging does Jemez Electric Cpf50 #1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the New Mexico average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Jemez Electric Cpf50 #1 compare with other stations in Hernandez?
Hernandez has 2 charging stations in the DOE registry with 2 ports. Jemez Electric Cpf50 #1 accounts for 50% of the charging ports in Hernandez. ChargePoint runs 2 stations in Hernandez. Statewide, New Mexico has 549 stations and 1,450 ports, the 32nd-largest station count of the 51 states and DC. The biggest station in New Mexico, Avanya Plaza - Tesla Supercharger in Albuquerque, has 24 ports.
Who operates Jemez Electric Cpf50 #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in New Mexico, 55% of the state's 549.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2023, one of 63 stations in New Mexico with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Jemez Electric Cpf50 #1 have?
Jemez Electric Cpf50 #1 has 1 charging port: 1 Level 2.
Does Jemez Electric Cpf50 #1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Jemez Electric Cpf50 #1 have?
Jemez Electric Cpf50 #1 has J1772 connectors.
Is Jemez Electric Cpf50 #1 open to the public?
Yes. Jemez Electric Cpf50 #1 is listed with public access, and its status is available.
Where is Jemez Electric Cpf50 #1?
Jemez Electric Cpf50 #1 is at 19365 US-84, Hernandez, NM 87537. Its coordinates are 36.04534, -106.10955.
More EV charging around Hernandez
Working with New Mexico charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 252592, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Jemez Electric Cpf50 #1, Hernandez, NM (AFDC station 252592)”, https://chargecensus.com/stations/new-mexico/jemez-electric-cpf50-1-252592 (data as of October 12, 2026).