ChargeCensus

HI Country Buick GMC

Available

EV charging station in Farmington, New Mexico on the EV Connect network — 1 DC fast. US DOE AFDC station 323382.

At a glance

HI Country Buick GMC is a public EV charging station at 1700 E SAN JUAN BLVD in Farmington, New Mexico, on the EV Connect network. It has 1 charging port (1 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Dec 22, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID323382
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateDec 22, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

EV Connect

Operates 1,601 stations in the DOE registry — view the full network →

Location

Address
1700 E SAN JUAN BLVD
ZIP
87401
Coordinates
36.73499, -108.18657

Within ~15 km

Nearby charging

What kind of charging does HI Country Buick GMC offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% below the New Mexico average of 2.6 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.

How does HI Country Buick GMC compare with other stations in Farmington?

Farmington has 13 charging stations in the DOE registry with 31 ports, the 5th-most of 84 cities and towns in New Mexico. HI Country Buick GMC accounts for 3% of the charging ports in Farmington. It is the only EV Connect station in Farmington. Statewide, New Mexico has 549 stations and 1,450 ports, the 32nd-largest station count of the 51 states and DC. The biggest station in New Mexico, Avanya Plaza - Tesla Supercharger in Albuquerque, has 24 ports.

Who operates HI Country Buick GMC?

EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 6 of those stations are in New Mexico, 1% of the state's 549.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 22, 2023, one of 63 stations in New Mexico with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does HI Country Buick GMC have?

HI Country Buick GMC has 1 charging port: 1 DC fast.

Does HI Country Buick GMC have DC fast charging?

Yes. The registry lists 1 DC fast port at HI Country Buick GMC, with CCS connectors.

What connectors does HI Country Buick GMC have?

HI Country Buick GMC has CCS connectors.

Is HI Country Buick GMC open to the public?

Yes. HI Country Buick GMC is listed with public access, and its status is available.

Where is HI Country Buick GMC?

HI Country Buick GMC is at 1700 E SAN JUAN BLVD, Farmington, NM 87401. Its coordinates are 36.73499, -108.18657.

More EV charging around Farmington

Working with New Mexico charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 323382, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “HI Country Buick GMC, Farmington, NM (AFDC station 323382)”, https://chargecensus.com/stations/new-mexico/hi-country-buick-gmc-323382 (data as of October 12, 2026).