Cielo EV Building 4 5
AvailableEV charging station in Albuquerque, New Mexico on the ChargePoint network — 2 Level 2. US DOE AFDC station 389153.
At a glance
Cielo EV Building 4 5 is a public EV charging station at 9320 San Pedro Dr NE in Albuquerque, New Mexico, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 3, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 389153 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 3, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 9320 San Pedro Dr NE
- City
- Albuquerque
- State
- New Mexico
- ZIP
- 87113
- Coordinates
- 35.18655, -106.57696
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- John Gordon Albuquerque Complex16 ports
Non-networked · Available
Tesla Supercharger · Available
- Rich Ford10 ports
Synergev · Available
Non-networked · Available
- Walmart 850 (Albuquerque, NM)10 ports
Electrify America · Available
What kind of charging does Cielo EV Building 4 5 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the New Mexico average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Cielo EV Building 4 5 compare with other stations in Albuquerque?
Albuquerque has 173 charging stations in the DOE registry with 455 ports, the most of 84 cities and towns in New Mexico. Cielo EV Building 4 5 accounts for under 1% of the charging ports in Albuquerque. ChargePoint runs 112 stations in Albuquerque. Statewide, New Mexico has 549 stations and 1,450 ports, the 32nd-largest station count of the 51 states and DC. The biggest station in New Mexico, Avanya Plaza - Tesla Supercharger in Albuquerque, has 24 ports.
Who operates Cielo EV Building 4 5?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 301 of those stations are in New Mexico, 55% of the state's 549.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 3, 2025, one of 166 stations in New Mexico with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Cielo EV Building 4 5 have?
Cielo EV Building 4 5 has 2 charging ports: 2 Level 2.
Does Cielo EV Building 4 5 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Cielo EV Building 4 5 have?
Cielo EV Building 4 5 has J1772 connectors.
Is Cielo EV Building 4 5 open to the public?
Yes. Cielo EV Building 4 5 is listed with public access, and its status is available.
Where is Cielo EV Building 4 5?
Cielo EV Building 4 5 is at 9320 San Pedro Dr NE, Albuquerque, NM 87113. Its coordinates are 35.18655, -106.57696.
More EV charging around Albuquerque
Working with New Mexico charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 389153, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Cielo EV Building 4 5, Albuquerque, NM (AFDC station 389153)”, https://chargecensus.com/stations/new-mexico/cielo-ev-building-4-5-389153 (data as of October 12, 2026).