ChargeCensus

Benlyn Construction

Available

EV charging station in Ruidoso, New Mexico on the Turnongreen network — 1 Level 2. US DOE AFDC station 440879.

At a glance

Benlyn Construction is a public EV charging station at 1058 Mecham Dr in Ruidoso, New Mexico, on the Turnongreen network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 18, 2024.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID440879
NetworkTurnongreen
StatusAvailable (E)
AccessPublic
FacilityRetail
Open dateApr 18, 2024
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Turnongreen

Operates 150 stations in the DOE registry — view the full network →

Location

Address
1058 Mecham Dr
City
Ruidoso
ZIP
88345
Coordinates
33.35563, -105.66693

Within ~15 km

Nearby charging

What kind of charging does Benlyn Construction offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the New Mexico average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a retail location.

How does Benlyn Construction compare with other stations in Ruidoso?

Ruidoso has 5 charging stations in the DOE registry with 10 ports, the 16th-most of 84 cities and towns in New Mexico. Benlyn Construction accounts for 10% of the charging ports in Ruidoso. Turnongreen runs 2 stations in Ruidoso. Statewide, New Mexico has 549 stations and 1,450 ports, the 32nd-largest station count of the 51 states and DC. The biggest station in New Mexico, Avanya Plaza - Tesla Supercharger in Albuquerque, has 24 ports.

Who operates Benlyn Construction?

Turnongreen operates 150 stations in the registry across 34 states, with 16 DC fast and 458 Level 2 ports in total. 2 of those stations are in New Mexico, under 1% of the state's 549.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 18, 2024, one of 93 stations in New Mexico with a 2024 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Benlyn Construction have?

Benlyn Construction has 1 charging port: 1 Level 2.

Does Benlyn Construction have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Benlyn Construction have?

Benlyn Construction has J1772 connectors.

Is Benlyn Construction open to the public?

Yes. Benlyn Construction is listed with public access, and its status is available.

Where is Benlyn Construction?

Benlyn Construction is at 1058 Mecham Dr, Ruidoso, NM 88345. Its coordinates are 33.35563, -105.66693.

More EV charging around Ruidoso

Working with New Mexico charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 440879, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Benlyn Construction, Ruidoso, NM (AFDC station 440879)”, https://chargecensus.com/stations/new-mexico/benlyn-construction-440879 (data as of October 12, 2026).