Westfield Gsp Gsp Charger 03
AvailableEV charging station in Paramus, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 105308.
At a glance
Westfield Gsp Gsp Charger 03 is a public EV charging station at 1 Garden State Plaza Pkwy in Paramus, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 14, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 105308 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 14, 2018 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1 Garden State Plaza Pkwy
- City
- Paramus
- State
- New Jersey
- ZIP
- 07652
- Coordinates
- 40.91554, -74.07650
Within ~15 km
Nearby charging
- Avalon Wyne39 ports
Loop · Available
- Garage32 ports
Evoke · Available
Tesla Supercharger · Available
Non-networked · Available
- Garage 1st Floor24 ports
Evoke · Available
- Sunset Pier 94 Studios L221 ports
Loop · Available
What kind of charging does Westfield Gsp Gsp Charger 03 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Westfield Gsp Gsp Charger 03 compare with other stations in Paramus?
Paramus has 44 charging stations in the DOE registry with 178 ports, the 4th-most of 408 cities and towns in New Jersey. Westfield Gsp Gsp Charger 03 accounts for 1% of the charging ports in Paramus. ChargePoint runs 29 stations in Paramus. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates Westfield Gsp Gsp Charger 03?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 14, 2018, one of 30 stations in New Jersey with a 2018 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Westfield Gsp Gsp Charger 03 have?
Westfield Gsp Gsp Charger 03 has 2 charging ports: 2 Level 2.
Does Westfield Gsp Gsp Charger 03 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Westfield Gsp Gsp Charger 03 have?
Westfield Gsp Gsp Charger 03 has J1772 connectors.
Is Westfield Gsp Gsp Charger 03 open to the public?
Yes. Westfield Gsp Gsp Charger 03 is listed with public access, and its status is available.
Where is Westfield Gsp Gsp Charger 03?
Westfield Gsp Gsp Charger 03 is at 1 Garden State Plaza Pkwy, Paramus, NJ 07652. Its coordinates are 40.91554, -74.07650.
More EV charging around Paramus
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 105308, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Westfield Gsp Gsp Charger 03, Paramus, NJ (AFDC station 105308)”, https://chargecensus.com/stations/new-jersey/westfield-gsp-gsp-charger-03-105308 (data as of October 12, 2026).