ChargeCensus

Washington Bid Washington Ps1

Available

EV charging station in Washington, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 196460.

At a glance

Washington Bid Washington Ps1 is a public EV charging station at 44 East Wshington Avenue in Washington, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 29, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID196460
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 29, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
44 East Wshington Avenue
City
Washington
ZIP
07882
Coordinates
40.75932, -74.97909

Within ~15 km

Nearby charging

What kind of charging does Washington Bid Washington Ps1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Washington Bid Washington Ps1 compare with other stations in Washington?

Washington has 3 charging stations in the DOE registry with 7 ports. Washington Bid Washington Ps1 accounts for 29% of the charging ports in Washington. It is the only ChargePoint station in Washington. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.

Who operates Washington Bid Washington Ps1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 29, 2021, one of 141 stations in New Jersey with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Washington Bid Washington Ps1 have?

Washington Bid Washington Ps1 has 2 charging ports: 2 Level 2.

Does Washington Bid Washington Ps1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Washington Bid Washington Ps1 have?

Washington Bid Washington Ps1 has J1772 connectors.

Is Washington Bid Washington Ps1 open to the public?

Yes. Washington Bid Washington Ps1 is listed with public access, and its status is available.

Where is Washington Bid Washington Ps1?

Washington Bid Washington Ps1 is at 44 East Wshington Avenue, Washington, NJ 07882. Its coordinates are 40.75932, -74.97909.

More EV charging around Washington

Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 196460, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Washington Bid Washington Ps1, Washington, NJ (AFDC station 196460)”, https://chargecensus.com/stations/new-jersey/washington-bid-washington-ps1-196460 (data as of October 12, 2026).