The Rail Station 1
AvailableEV charging station in Red Bank, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 227593.
At a glance
The Rail Station 1 is a public EV charging station at 107 Oakland St in Red Bank, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 15, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 227593 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 15, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 107 Oakland St
- City
- Red Bank
- State
- New Jersey
- ZIP
- 07701
- Coordinates
- 40.34764, -74.07448
Within ~15 km
Nearby charging
- KWEV - 301 Memorial Dr20 ports
Kwev · Available
Tesla Supercharger · Available
Tesla Destination · Available
FLO · Available
- Bell Works - Tesla Destination11 ports
Tesla Destination · Available
- Lester Glenn Ford8 ports
ChargeSmart EV · Available
What kind of charging does The Rail Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Rail Station 1 compare with other stations in Red Bank?
Red Bank has 13 charging stations in the DOE registry with 22 ports. The Rail Station 1 accounts for 9% of the charging ports in Red Bank. ChargePoint runs 11 stations in Red Bank. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates The Rail Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 15, 2022, one of 311 stations in New Jersey with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Rail Station 1 have?
The Rail Station 1 has 2 charging ports: 2 Level 2.
Does The Rail Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Rail Station 1 have?
The Rail Station 1 has J1772 connectors.
Is The Rail Station 1 open to the public?
Yes. The Rail Station 1 is listed with public access, and its status is available.
Where is The Rail Station 1?
The Rail Station 1 is at 107 Oakland St, Red Bank, NJ 07701. Its coordinates are 40.34764, -74.07448.
More EV charging around Red Bank
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 227593, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Rail Station 1, Red Bank, NJ (AFDC station 227593)”, https://chargecensus.com/stations/new-jersey/the-rail-station-1-227593 (data as of October 12, 2026).