SWTCH Energy
PlannedEV charging station in Manchester Township, New Jersey on the SWTCH network — 1 Level 2. US DOE AFDC station 419968.
At a glance
SWTCH Energy is a public EV charging station at 1 Colonial Dr in Manchester Township, New Jersey, on the SWTCH network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as planned.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 419968 |
| Network | SWTCH |
| Status | Planned (P) |
| Access | Public |
| Facility | Municipal government |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 1 Colonial Dr
- City
- Manchester Township
- State
- New Jersey
- ZIP
- 08759
- Coordinates
- 40.00658, -74.29703
Within ~15 km
Nearby charging
Tesla Destination · Available
- KWEV - 1301 Cedarview Ave16 ports
Kwev · Available
- KWEV - 1303 Cedarview Ave15 ports
Kwev · Available
- Larson Ford12 ports
ChargeSmart EV · Available
Tesla Supercharger · Available
- Humble Warehouse Llc11 ports
evGateway · Available
What kind of charging does SWTCH Energy offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 72% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a municipal government location.
How does SWTCH Energy compare with other stations in Manchester Township?
Manchester Township has 2 charging stations in the DOE registry with 3 ports. SWTCH Energy accounts for 33% of the charging ports in Manchester Township. It is the only SWTCH station in Manchester Township. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates SWTCH Energy?
SWTCH operates 657 stations in the registry across 32 states, with 318 DC fast and 2,390 Level 2 ports in total. 18 of those stations are in New Jersey, under 1% of the state's 2,287.
What does the “Planned” status mean?
“Planned” means the station has been reported to the registry as planned and is not yet open. Its access code is public, meaning it is listed as open to any driver. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does SWTCH Energy have?
SWTCH Energy has 1 charging port: 1 Level 2.
Does SWTCH Energy have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does SWTCH Energy have?
SWTCH Energy has J1772 connectors.
Is charging at SWTCH Energy free?
Pricing as reported to the DOE registry: Free.
Is SWTCH Energy open to the public?
Yes. SWTCH Energy is listed with public access, and its status is planned.
Where is SWTCH Energy?
SWTCH Energy is at 1 Colonial Dr, Manchester Township, NJ 08759. Its coordinates are 40.00658, -74.29703.
More EV charging around Manchester Township
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 419968, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “SWTCH Energy, Manchester Township, NJ (AFDC station 419968)”, https://chargecensus.com/stations/new-jersey/swtch-energy-419968 (data as of October 12, 2026).