ChargeCensus

New Chargers Side Lv3

Available

EV charging station in Flemington, New Jersey on the ChargePoint network — 1 DC fast. US DOE AFDC station 254350.

At a glance

New Chargers Side Lv3 is a public EV charging station at 180 US-202 in Flemington, New Jersey, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Feb 22, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID254350
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 22, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
180 US-202
ZIP
08822
Coordinates
40.48098, -74.86295

Within ~15 km

Nearby charging

What kind of charging does New Chargers Side Lv3 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 72% below the New Jersey average of 3.6 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does New Chargers Side Lv3 compare with other stations in Flemington?

Flemington has 11 charging stations in the DOE registry with 26 ports. New Chargers Side Lv3 accounts for 4% of the charging ports in Flemington. ChargePoint runs 5 stations in Flemington. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.

Who operates New Chargers Side Lv3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 22, 2023, one of 337 stations in New Jersey with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does New Chargers Side Lv3 have?

New Chargers Side Lv3 has 1 charging port: 1 DC fast.

Does New Chargers Side Lv3 have DC fast charging?

Yes. The registry lists 1 DC fast port at New Chargers Side Lv3, with CHAdeMO and CCS connectors.

What connectors does New Chargers Side Lv3 have?

New Chargers Side Lv3 has CHAdeMO and CCS connectors.

Is New Chargers Side Lv3 open to the public?

Yes. New Chargers Side Lv3 is listed with public access, and its status is available.

Where is New Chargers Side Lv3?

New Chargers Side Lv3 is at 180 US-202, Flemington, NJ 08822. Its coordinates are 40.48098, -74.86295.

More EV charging around Flemington

Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 254350, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “New Chargers Side Lv3, Flemington, NJ (AFDC station 254350)”, https://chargecensus.com/stations/new-jersey/new-chargers-side-lv3-254350 (data as of October 12, 2026).