ChargeCensus

Ewingtownship Ewing Lower 1

Available

EV charging station in Ewing Township, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 346861.

At a glance

Ewingtownship Ewing Lower 1 is a public EV charging station at 2 Jake Garzio Drive in Ewing Township, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 25, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID346861
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 25, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2 Jake Garzio Drive
ZIP
08628
Coordinates
40.27586, -74.80205

Within ~15 km

Nearby charging

What kind of charging does Ewingtownship Ewing Lower 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ewingtownship Ewing Lower 1 compare with other stations in Ewing Township?

Ewing Township has 44 charging stations in the DOE registry with 98 ports, the 3rd-most of 408 cities and towns in New Jersey. Ewingtownship Ewing Lower 1 accounts for 2% of the charging ports in Ewing Township. ChargePoint runs 42 stations in Ewing Township. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.

Who operates Ewingtownship Ewing Lower 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 25, 2024, one of 364 stations in New Jersey with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ewingtownship Ewing Lower 1 have?

Ewingtownship Ewing Lower 1 has 2 charging ports: 2 Level 2.

Does Ewingtownship Ewing Lower 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Ewingtownship Ewing Lower 1 have?

Ewingtownship Ewing Lower 1 has J1772 connectors.

Is Ewingtownship Ewing Lower 1 open to the public?

Yes. Ewingtownship Ewing Lower 1 is listed with public access, and its status is available.

Where is Ewingtownship Ewing Lower 1?

Ewingtownship Ewing Lower 1 is at 2 Jake Garzio Drive, Ewing Township, NJ 08628. Its coordinates are 40.27586, -74.80205.

More EV charging around Ewing Township

Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 346861, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ewingtownship Ewing Lower 1, Ewing Township, NJ (AFDC station 346861)”, https://chargecensus.com/stations/new-jersey/ewingtownship-ewing-lower-1-346861 (data as of October 12, 2026).