Burlington EV Ev1-Bld1
AvailableEV charging station in Burlington, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 374636.
At a glance
Burlington EV Ev1-Bld1 is a public EV charging station at 700 John F Kennedy Way in Burlington, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 28, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 374636 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 28, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 700 John F Kennedy Way
- City
- Burlington
- State
- New Jersey
- ZIP
- 08016
- Coordinates
- 40.04379, -74.87643
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Medford, NJ - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Wawa Store 0219 (Bristol, PA)10 ports
Electrify America · Available
IONNA · Available
What kind of charging does Burlington EV Ev1-Bld1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Burlington EV Ev1-Bld1 compare with other stations in Burlington?
Burlington has 16 charging stations in the DOE registry with 35 ports. Burlington EV Ev1-Bld1 accounts for 6% of the charging ports in Burlington. ChargePoint runs 14 stations in Burlington. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates Burlington EV Ev1-Bld1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 28, 2024, one of 364 stations in New Jersey with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Burlington EV Ev1-Bld1 have?
Burlington EV Ev1-Bld1 has 2 charging ports: 2 Level 2.
Does Burlington EV Ev1-Bld1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Burlington EV Ev1-Bld1 have?
Burlington EV Ev1-Bld1 has J1772 connectors.
Is Burlington EV Ev1-Bld1 open to the public?
Yes. Burlington EV Ev1-Bld1 is listed with public access, and its status is available.
Where is Burlington EV Ev1-Bld1?
Burlington EV Ev1-Bld1 is at 700 John F Kennedy Way, Burlington, NJ 08016. Its coordinates are 40.04379, -74.87643.
More EV charging around Burlington
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 374636, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Burlington EV Ev1-Bld1, Burlington, NJ (AFDC station 374636)”, https://chargecensus.com/stations/new-jersey/burlington-ev-ev1-bld1-374636 (data as of October 12, 2026).