Bt Town Hall Bernards Twp1
AvailableEV charging station in Basking Ridge, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 152487.
At a glance
Bt Town Hall Bernards Twp1 is a public EV charging station at 1 Collyer Ln in Basking Ridge, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 17, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 152487 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 17, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1 Collyer Ln
- City
- Basking Ridge
- State
- New Jersey
- ZIP
- 07920
- Coordinates
- 40.69713, -74.54658
Within ~15 km
Nearby charging
- Barclays Whippany Garage 30065 ports
Evoke · Available
- Avalon Parsippany48 ports
Loop · Available
- Barclays Whippany Garage 40048 ports
Evoke · Available
Tesla Destination · Available
OpConnect · Available
- Avalon Parsippany 3 Campus24 ports
Loop · Available
What kind of charging does Bt Town Hall Bernards Twp1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bt Town Hall Bernards Twp1 compare with other stations in Basking Ridge?
Basking Ridge has 12 charging stations in the DOE registry with 52 ports. Bt Town Hall Bernards Twp1 accounts for 4% of the charging ports in Basking Ridge. ChargePoint runs 7 stations in Basking Ridge. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates Bt Town Hall Bernards Twp1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 17, 2020, one of 69 stations in New Jersey with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bt Town Hall Bernards Twp1 have?
Bt Town Hall Bernards Twp1 has 2 charging ports: 2 Level 2.
Does Bt Town Hall Bernards Twp1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bt Town Hall Bernards Twp1 have?
Bt Town Hall Bernards Twp1 has J1772 connectors.
Is Bt Town Hall Bernards Twp1 open to the public?
Yes. Bt Town Hall Bernards Twp1 is listed with public access, and its status is available.
Where is Bt Town Hall Bernards Twp1?
Bt Town Hall Bernards Twp1 is at 1 Collyer Ln, Basking Ridge, NJ 07920. Its coordinates are 40.69713, -74.54658.
More EV charging around Basking Ridge
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 152487, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bt Town Hall Bernards Twp1, Basking Ridge, NJ (AFDC station 152487)”, https://chargecensus.com/stations/new-jersey/bt-town-hall-bernards-twp1-152487 (data as of October 12, 2026).