Bridgewater01 Bridgewater01
AvailableEV charging station in Bound Brook, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 335491.
At a glance
Bridgewater01 Bridgewater01 is a public EV charging station at 800 Thompson Ave in Bound Brook, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 4, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 335491 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 4, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 800 Thompson Ave
- City
- Bound Brook
- State
- New Jersey
- ZIP
- 08805
- Coordinates
- 40.57927, -74.55653
Within ~15 km
Nearby charging
- Kilmer Nj Sdc150 ports
Non-networked · Available
Tesla Destination · Available
OpConnect · Available
- Verizon - Basking Ridge22 ports
Non-networked · Available
- Verizon - Piscataway20 ports
Non-networked · Available
Tesla Supercharger · Available
What kind of charging does Bridgewater01 Bridgewater01 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bridgewater01 Bridgewater01 compare with other stations in Bound Brook?
Bound Brook has 8 charging stations in the DOE registry with 15 ports. Bridgewater01 Bridgewater01 accounts for 13% of the charging ports in Bound Brook. ChargePoint runs 8 stations in Bound Brook. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates Bridgewater01 Bridgewater01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 4, 2024, one of 364 stations in New Jersey with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bridgewater01 Bridgewater01 have?
Bridgewater01 Bridgewater01 has 2 charging ports: 2 Level 2.
Does Bridgewater01 Bridgewater01 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bridgewater01 Bridgewater01 have?
Bridgewater01 Bridgewater01 has J1772 connectors.
Is Bridgewater01 Bridgewater01 open to the public?
Yes. Bridgewater01 Bridgewater01 is listed with public access, and its status is available.
Where is Bridgewater01 Bridgewater01?
Bridgewater01 Bridgewater01 is at 800 Thompson Ave, Bound Brook, NJ 08805. Its coordinates are 40.57927, -74.55653.
More EV charging around Bound Brook
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 335491, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bridgewater01 Bridgewater01, Bound Brook, NJ (AFDC station 335491)”, https://chargecensus.com/stations/new-jersey/bridgewater01-bridgewater01-335491 (data as of October 12, 2026).