Briad Group Cy Hamilton
AvailableEV charging station in Trenton, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 197191.
At a glance
Briad Group Cy Hamilton is a public EV charging station at 530 US-130 in Trenton, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 7, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 197191 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 7, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 530 US-130
- City
- Trenton
- State
- New Jersey
- ZIP
- 08691
- Coordinates
- 40.18780, -74.65635
Within ~15 km
Nearby charging
OpConnect · Available
- Woodmont Forge Poweral15 ports
Red E · Available
Tesla Supercharger · Available
- Rider University12 ports
Non-networked · Available
Tesla Destination · Available
Tesla Destination · Available
What kind of charging does Briad Group Cy Hamilton offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Briad Group Cy Hamilton compare with other stations in Trenton?
Trenton has 14 charging stations in the DOE registry with 35 ports. Briad Group Cy Hamilton accounts for 6% of the charging ports in Trenton. ChargePoint runs 9 stations in Trenton. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates Briad Group Cy Hamilton?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 7, 2021, one of 141 stations in New Jersey with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Briad Group Cy Hamilton have?
Briad Group Cy Hamilton has 2 charging ports: 2 Level 2.
Does Briad Group Cy Hamilton have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Briad Group Cy Hamilton have?
Briad Group Cy Hamilton has J1772 connectors.
Is Briad Group Cy Hamilton open to the public?
Yes. Briad Group Cy Hamilton is listed with public access, and its status is available.
Where is Briad Group Cy Hamilton?
Briad Group Cy Hamilton is at 530 US-130, Trenton, NJ 08691. Its coordinates are 40.18780, -74.65635.
More EV charging around Trenton
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 197191, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Briad Group Cy Hamilton, Trenton, NJ (AFDC station 197191)”, https://chargecensus.com/stations/new-jersey/briad-group-cy-hamilton-197191 (data as of October 12, 2026).