Beach Haven Borough Hall
AvailableEV charging station in Beach Haven, New Jersey on the ChargePoint network — 2 Level 2. US DOE AFDC station 222509.
At a glance
Beach Haven Borough Hall is a public EV charging station at 300 Engleside Ave in Beach Haven, New Jersey, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 6, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 222509 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 6, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 300 Engleside Ave
- City
- Beach Haven
- State
- New Jersey
- ZIP
- 08008
- Coordinates
- 39.56306, -74.24111
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Causeway Ford4 ports
ChargeSmart EV · Available
- Long Beach Twp Holgate Ps12 ports
ChargePoint · Available
- Beach Haven Taylor Avenue2 ports
ChargePoint · Available
- Leht Leht Ps 12 ports
ChargePoint · Available
- Beach Haven Dock Road2 ports
ChargePoint · Available
What kind of charging does Beach Haven Borough Hall offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 44% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Beach Haven Borough Hall compare with other stations in Beach Haven?
Beach Haven has 6 charging stations in the DOE registry with 11 ports. Beach Haven Borough Hall accounts for 18% of the charging ports in Beach Haven. ChargePoint runs 5 stations in Beach Haven. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates Beach Haven Borough Hall?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 6, 2022, one of 311 stations in New Jersey with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Beach Haven Borough Hall have?
Beach Haven Borough Hall has 2 charging ports: 2 Level 2.
Does Beach Haven Borough Hall have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Beach Haven Borough Hall have?
Beach Haven Borough Hall has J1772 connectors.
Is Beach Haven Borough Hall open to the public?
Yes. Beach Haven Borough Hall is listed with public access, and its status is available.
Where is Beach Haven Borough Hall?
Beach Haven Borough Hall is at 300 Engleside Ave, Beach Haven, NJ 08008. Its coordinates are 39.56306, -74.24111.
More EV charging around Beach Haven
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 222509, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Beach Haven Borough Hall, Beach Haven, NJ (AFDC station 222509)”, https://chargecensus.com/stations/new-jersey/beach-haven-borough-hall-222509 (data as of October 12, 2026).