At a glance
Autel - Klabin Eco Power is a public EV charging station at 9 Sand Park Rd in Cedar Grove, New Jersey, on the Autel network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 28, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 312008 |
| Network | Autel |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Sep 28, 2023 |
| Last updated at source | Dec 5, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 9 Sand Park Rd
- City
- Cedar Grove
- State
- New Jersey
- ZIP
- 07009
- Coordinates
- 40.86659, -74.22679
Within ~15 km
Nearby charging
- Avalon Becker Farm - Livingston48 ports
Loop · Available
- Avalon Wyne39 ports
Loop · Available
- EV Edison Charging Hub30 ports
Non-networked · Available
- Avalon at Becker Farm28 ports
Loop · Available
Tesla Supercharger · Available
- Newark, NJ - Tesla Supercharger16 ports
Tesla Supercharger · Available
What kind of charging does Autel - Klabin Eco Power offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 72% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.
How does Autel - Klabin Eco Power compare with other stations in Cedar Grove?
Cedar Grove has 4 charging stations in the DOE registry with 7 ports. Autel - Klabin Eco Power accounts for 14% of the charging ports in Cedar Grove. It is the only Autel station in Cedar Grove. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.
Who operates Autel - Klabin Eco Power?
Autel operates 77 stations in the registry across 20 states, with 117 DC fast and 293 Level 2 ports in total. 2 of those stations are in New Jersey, under 1% of the state's 2,287.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 28, 2023, one of 337 stations in New Jersey with a 2023 open date. The station's record was last updated at the source on Dec 5, 2025.
Frequently asked questions
How many chargers does Autel - Klabin Eco Power have?
Autel - Klabin Eco Power has 1 charging port: 1 Level 2.
Does Autel - Klabin Eco Power have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Autel - Klabin Eco Power have?
Autel - Klabin Eco Power has J1772 connectors.
Is Autel - Klabin Eco Power open to the public?
Yes. Autel - Klabin Eco Power is listed with public access, and its status is available.
Where is Autel - Klabin Eco Power?
Autel - Klabin Eco Power is at 9 Sand Park Rd, Cedar Grove, NJ 07009. Its coordinates are 40.86659, -74.22679.
More EV charging around Cedar Grove
Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 312008, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Autel - Klabin Eco Power, Cedar Grove, NJ (AFDC station 312008)”, https://chargecensus.com/stations/new-jersey/autel-klabin-eco-power-312008 (data as of October 12, 2026).