ChargeCensus

Ampcap 0722 Mantua 2

Available

EV charging station in Mantua Township, New Jersey on the ChargePoint network — 1 Level 2. US DOE AFDC station 182843.

At a glance

Ampcap 0722 Mantua 2 is a public EV charging station at 300 Bridgeton Pike in Mantua Township, New Jersey, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID182843
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
300 Bridgeton Pike
ZIP
08051
Coordinates
39.78854, -75.17900

Within ~15 km

Nearby charging

What kind of charging does Ampcap 0722 Mantua 2 offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 72% below the New Jersey average of 3.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ampcap 0722 Mantua 2 compare with other stations in Mantua Township?

Mantua Township has 10 charging stations in the DOE registry with 18 ports. Ampcap 0722 Mantua 2 accounts for 6% of the charging ports in Mantua Township. ChargePoint runs 10 stations in Mantua Township. Statewide, New Jersey has 2,287 stations and 8,217 ports, the 9th-largest station count of the 51 states and DC. The biggest station in New Jersey, Kilmer Nj Sdc in Edison, has 150 ports.

Who operates Ampcap 0722 Mantua 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,216 of those stations are in New Jersey, 53% of the state's 2,287.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 141 stations in New Jersey with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ampcap 0722 Mantua 2 have?

Ampcap 0722 Mantua 2 has 1 charging port: 1 Level 2.

Does Ampcap 0722 Mantua 2 have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Ampcap 0722 Mantua 2 have?

Ampcap 0722 Mantua 2 has J1772 connectors.

Is Ampcap 0722 Mantua 2 open to the public?

Yes. Ampcap 0722 Mantua 2 is listed with public access, and its status is available.

Where is Ampcap 0722 Mantua 2?

Ampcap 0722 Mantua 2 is at 300 Bridgeton Pike, Mantua Township, NJ 08051. Its coordinates are 39.78854, -75.17900.

More EV charging around Mantua Township

Working with New Jersey charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 182843, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ampcap 0722 Mantua 2, Mantua Township, NJ (AFDC station 182843)”, https://chargecensus.com/stations/new-jersey/ampcap-0722-mantua-2-182843 (data as of October 12, 2026).