ChargeCensus

Tuscan Village Station 1

Temporarily unavailable

EV charging station in Salem, New Hampshire on the ChargePoint network — 2 Level 2. US DOE AFDC station 189829.

At a glance

Tuscan Village Station 1 is a public EV charging station at 86 S Broadway in Salem, New Hampshire, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since May 20, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID189829
NetworkChargePoint
StatusTemporarily unavailable (T)
AccessPublic
Open dateMay 20, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
86 S Broadway
City
Salem
ZIP
03079
Coordinates
42.77060, -71.22304

Within ~15 km

Nearby charging

What kind of charging does Tuscan Village Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the New Hampshire average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Tuscan Village Station 1 compare with other stations in Salem?

Salem has 17 charging stations in the DOE registry with 40 ports, the 4th-most of 74 cities and towns in New Hampshire. Tuscan Village Station 1 accounts for 5% of the charging ports in Salem. ChargePoint runs 10 stations in Salem. Statewide, New Hampshire has 343 stations and 902 ports, the 41st-largest station count of the 51 states and DC. The biggest station in New Hampshire, Dartmouth Hitchcock Medical Center in Lebanon, has 16 ports.

Who operates Tuscan Village Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 152 of those stations are in New Hampshire, 44% of the state's 343.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on May 20, 2021, one of 21 stations in New Hampshire with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Tuscan Village Station 1 have?

Tuscan Village Station 1 has 2 charging ports: 2 Level 2.

Does Tuscan Village Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Tuscan Village Station 1 have?

Tuscan Village Station 1 has J1772 connectors.

Is Tuscan Village Station 1 open to the public?

Yes. Tuscan Village Station 1 is listed with public access, and its status is temporarily unavailable.

Where is Tuscan Village Station 1?

Tuscan Village Station 1 is at 86 S Broadway, Salem, NH 03079. Its coordinates are 42.77060, -71.22304.

More EV charging around Salem

Working with New Hampshire charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 189829, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Tuscan Village Station 1, Salem, NH (AFDC station 189829)”, https://chargecensus.com/stations/new-hampshire/tuscan-village-station-1-189829 (data as of October 12, 2026).