The Chandler
AvailableEV charging station in Bedford, New Hampshire on the FLO network — 4 Level 2. US DOE AFDC station 421130.
At a glance
The Chandler is a public EV charging station at 107 South River Road in Bedford, New Hampshire, on the FLO network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 28, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 421130 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 28, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 107 South River Road
- City
- Bedford
- State
- New Hampshire
- ZIP
- 03110
- Coordinates
- 42.95627, -71.47653
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- The Mall of New Hampshire MB.HPC10 ports
Mercedes-Benz HPC · Available
Tesla Supercharger · Available
- Genesis of Manchester6 ports
Blink · Available
Electrify America · Available
- Eversource Energy Park5 ports
Non-networked · Available
What kind of charging does The Chandler offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 52% above the New Hampshire average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Chandler compare with other stations in Bedford?
Bedford has 6 charging stations in the DOE registry with 16 ports, the 17th-most of 74 cities and towns in New Hampshire. The Chandler accounts for 25% of the charging ports in Bedford. It is the only FLO station in Bedford. Statewide, New Hampshire has 343 stations and 902 ports, the 41st-largest station count of the 51 states and DC. The biggest station in New Hampshire, Dartmouth Hitchcock Medical Center in Lebanon, has 16 ports.
Who operates The Chandler?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 2 of those stations are in New Hampshire, under 1% of the state's 343.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 28, 2025, one of 44 stations in New Hampshire with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Chandler have?
The Chandler has 4 charging ports: 4 Level 2.
Does The Chandler have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does The Chandler have?
The Chandler has J1772 connectors.
Is The Chandler open to the public?
Yes. The Chandler is listed with public access, and its status is available.
Where is The Chandler?
The Chandler is at 107 South River Road, Bedford, NH 03110. Its coordinates are 42.95627, -71.47653.
More EV charging around Bedford
Working with New Hampshire charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 421130, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Chandler, Bedford, NH (AFDC station 421130)”, https://chargecensus.com/stations/new-hampshire/the-chandler-421130 (data as of October 12, 2026).