ChargeCensus

Revision Energy Level 2 Charger

Temporarily unavailable

EV charging station in Epping, New Hampshire on the ChargePoint network — 2 Level 2. US DOE AFDC station 457512.

At a glance

Revision Energy Level 2 Charger is a public EV charging station at 24 Calef Hwy in Epping, New Hampshire, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Apr 11, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID457512
NetworkChargePoint
StatusTemporarily unavailable (T)
AccessPublic
Open dateApr 11, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
24 Calef Hwy
City
Epping
ZIP
03042
Coordinates
43.02297, -71.07662

Within ~15 km

Nearby charging

What kind of charging does Revision Energy Level 2 Charger offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the New Hampshire average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Revision Energy Level 2 Charger compare with other stations in Epping?

Epping has 3 charging stations in the DOE registry with 4 ports. Revision Energy Level 2 Charger accounts for 50% of the charging ports in Epping. ChargePoint runs 3 stations in Epping. Statewide, New Hampshire has 343 stations and 902 ports, the 41st-largest station count of the 51 states and DC. The biggest station in New Hampshire, Dartmouth Hitchcock Medical Center in Lebanon, has 16 ports.

Who operates Revision Energy Level 2 Charger?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 152 of those stations are in New Hampshire, 44% of the state's 343.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 11, 2026, one of 39 stations in New Hampshire with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Revision Energy Level 2 Charger have?

Revision Energy Level 2 Charger has 2 charging ports: 2 Level 2.

Does Revision Energy Level 2 Charger have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Revision Energy Level 2 Charger have?

Revision Energy Level 2 Charger has J1772 connectors.

Is Revision Energy Level 2 Charger open to the public?

Yes. Revision Energy Level 2 Charger is listed with public access, and its status is temporarily unavailable.

Where is Revision Energy Level 2 Charger?

Revision Energy Level 2 Charger is at 24 Calef Hwy, Epping, NH 03042. Its coordinates are 43.02297, -71.07662.

More EV charging around Epping

Working with New Hampshire charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 457512, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Revision Energy Level 2 Charger, Epping, NH (AFDC station 457512)”, https://chargecensus.com/stations/new-hampshire/revision-energy-level-2-charger-457512 (data as of October 12, 2026).