Monadnock Food Level 2
AvailableEV charging station in Keene, New Hampshire on the ChargePoint network — 2 Level 2. US DOE AFDC station 324381.
At a glance
Monadnock Food Level 2 is a public EV charging station at 34 Cypress Street in Keene, New Hampshire, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 9, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 324381 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 9, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 34 Cypress Street
- City
- Keene
- State
- New Hampshire
- ZIP
- 03431
- Coordinates
- 42.93161, -72.27641
Within ~15 km
Nearby charging
- Town of Walpole4 ports
Blink · Available
- Monadnock Ford3 ports
Non-networked · Available
- Fairfield Kia2 ports
Non-networked · Available
- 410 Winchester St2 ports
ChargeLab · Available
- Commercial Street Lot2 ports
Blink · Available
- Monadnock Family Services1 ports
Non-networked · Available
What kind of charging does Monadnock Food Level 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the New Hampshire average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Monadnock Food Level 2 compare with other stations in Keene?
Keene has 8 charging stations in the DOE registry with 12 ports, the 13th-most of 74 cities and towns in New Hampshire. Monadnock Food Level 2 accounts for 17% of the charging ports in Keene. ChargePoint runs 3 stations in Keene. Statewide, New Hampshire has 343 stations and 902 ports, the 41st-largest station count of the 51 states and DC. The biggest station in New Hampshire, Dartmouth Hitchcock Medical Center in Lebanon, has 16 ports.
Who operates Monadnock Food Level 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 152 of those stations are in New Hampshire, 44% of the state's 343.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 9, 2024, one of 53 stations in New Hampshire with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Monadnock Food Level 2 have?
Monadnock Food Level 2 has 2 charging ports: 2 Level 2.
Does Monadnock Food Level 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Monadnock Food Level 2 have?
Monadnock Food Level 2 has J1772 connectors.
Is Monadnock Food Level 2 open to the public?
Yes. Monadnock Food Level 2 is listed with public access, and its status is available.
Where is Monadnock Food Level 2?
Monadnock Food Level 2 is at 34 Cypress Street, Keene, NH 03431. Its coordinates are 42.93161, -72.27641.
More EV charging around Keene
Working with New Hampshire charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 324381, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Monadnock Food Level 2, Keene, NH (AFDC station 324381)”, https://chargecensus.com/stations/new-hampshire/monadnock-food-level-2-324381 (data as of October 12, 2026).