ChargeCensus

Church Landing at Mill Falls

Available

EV charging station in Meredith, New Hampshire, not on a charging network — 4 Level 2. US DOE AFDC station 60798.

At a glance

Church Landing at Mill Falls is a public EV charging station at 281 Daniel Webster Hwy in Meredith, New Hampshire, not attached to a charging network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 15, 2014.

Total ports
4
DC fast
0
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID60798
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityHotel
Open dateJan 15, 2014
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
281 Daniel Webster Hwy
City
Meredith
ZIP
03253
Coordinates
43.65432, -71.49656

Within ~15 km

Nearby charging

What kind of charging does Church Landing at Mill Falls offer?

Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 52% above the New Hampshire average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a hotel location.

How does Church Landing at Mill Falls compare with other stations in Meredith?

Meredith has 2 charging stations in the DOE registry with 10 ports. Church Landing at Mill Falls accounts for 40% of the charging ports in Meredith. Statewide, New Hampshire has 343 stations and 902 ports, the 41st-largest station count of the 51 states and DC. The biggest station in New Hampshire, Dartmouth Hitchcock Medical Center in Lebanon, has 16 ports.

Who operates Church Landing at Mill Falls?

Church Landing at Mill Falls is listed as non-networked: its chargers are not run through a charging-network account. New Hampshire has 68 non-networked stations, 20% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 15, 2014, one of 12 stations in New Hampshire with a 2014 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Church Landing at Mill Falls have?

Church Landing at Mill Falls has 4 charging ports: 4 Level 2.

Does Church Landing at Mill Falls have DC fast charging?

No. The registry lists no DC fast ports here; its 4 ports are all Level 2.

What connectors does Church Landing at Mill Falls have?

Church Landing at Mill Falls has J1772 connectors.

Is charging at Church Landing at Mill Falls free?

Pricing as reported to the DOE registry: Free.

Is Church Landing at Mill Falls open to the public?

Yes. Church Landing at Mill Falls is listed with public access, and its status is available.

Where is Church Landing at Mill Falls?

Church Landing at Mill Falls is at 281 Daniel Webster Hwy, Meredith, NH 03253. Its coordinates are 43.65432, -71.49656.

More EV charging around Meredith

Working with New Hampshire charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 60798, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Church Landing at Mill Falls, Meredith, NH (AFDC station 60798)”, https://chargecensus.com/stations/new-hampshire/church-landing-at-mill-falls-60798 (data as of October 12, 2026).