23 Charger Station 1
AvailableEV charging station in Littleton, New Hampshire on the ChargePoint network — 2 Level 2. US DOE AFDC station 307492.
At a glance
23 Charger Station 1 is a public EV charging station at 23 Ammonoosuc St in Littleton, New Hampshire, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 19, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 307492 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 19, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 23 Ammonoosuc St
- City
- Littleton
- State
- New Hampshire
- ZIP
- 03561
- Coordinates
- 44.30639, -71.77566
Within ~15 km
Nearby charging
- Crosstown Motors6 ports
Blink · Available
- Littleton Food Co-op2 ports
Non-networked · Available
- Littleton Chevrolet2 ports
EV Connect · Available
- Littleton Studio School2 ports
Non-networked · Available
- Thayers Lane Thayers Lane2 ports
ChargePoint · Available
ChargePoint · Available
What kind of charging does 23 Charger Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the New Hampshire average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 23 Charger Station 1 compare with other stations in Littleton?
Littleton has 8 charging stations in the DOE registry with 20 ports, the 14th-most of 74 cities and towns in New Hampshire. 23 Charger Station 1 accounts for 10% of the charging ports in Littleton. ChargePoint runs 4 stations in Littleton. Statewide, New Hampshire has 343 stations and 902 ports, the 41st-largest station count of the 51 states and DC. The biggest station in New Hampshire, Dartmouth Hitchcock Medical Center in Lebanon, has 16 ports.
Who operates 23 Charger Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 152 of those stations are in New Hampshire, 44% of the state's 343.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 19, 2023, one of 55 stations in New Hampshire with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 23 Charger Station 1 have?
23 Charger Station 1 has 2 charging ports: 2 Level 2.
Does 23 Charger Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 23 Charger Station 1 have?
23 Charger Station 1 has J1772 connectors.
Is 23 Charger Station 1 open to the public?
Yes. 23 Charger Station 1 is listed with public access, and its status is available.
Where is 23 Charger Station 1?
23 Charger Station 1 is at 23 Ammonoosuc St, Littleton, NH 03561. Its coordinates are 44.30639, -71.77566.
More EV charging around Littleton
Working with New Hampshire charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 307492, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “23 Charger Station 1, Littleton, NH (AFDC station 307492)”, https://chargecensus.com/stations/new-hampshire/23-charger-station-1-307492 (data as of October 12, 2026).