ChargeCensus

Home2 Suites by Hilton Reno

Available

EV charging station in Reno, Nevada, not on a charging network — 2 Level 2. US DOE AFDC station 218644.

At a glance

Home2 Suites by Hilton Reno is a public EV charging station at 1111 Meadowood Mall Link in Reno, Nevada, not attached to a charging network. It has 2 charging ports (2 Level 2) with NACS (Tesla) connectors. The US DOE registry lists it as available, open since May 18, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID218644
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityHotel
Open dateMay 18, 2022
Last updated at sourceAug 11, 2026

Plugs

Connectors & pricing

  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
1111 Meadowood Mall Link
City
Reno
State
Nevada
ZIP
89502
Coordinates
39.47605, -119.78649

Within ~15 km

Nearby charging

What kind of charging does Home2 Suites by Hilton Reno offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 57% below the Nevada average of 4.7 ports per station. The registry lists one connector type: NACS (Tesla), the North American Charging Standard connector. Pricing as reported to the registry: “Free”. The site is listed as a hotel location.

How does Home2 Suites by Hilton Reno compare with other stations in Reno?

Reno has 97 charging stations in the DOE registry with 304 ports, the 2nd-most of 54 cities and towns in Nevada. Home2 Suites by Hilton Reno accounts for under 1% of the charging ports in Reno. Statewide, Nevada has 688 stations and 3,236 ports, the 29th-largest station count of the 51 states and DC. The biggest station in Nevada, Tesla Gigafactory - Tesla Destination in Sparks, has 128 ports.

Who operates Home2 Suites by Hilton Reno?

Home2 Suites by Hilton Reno is listed as non-networked: its chargers are not run through a charging-network account. Nevada has 55 non-networked stations, 8% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 18, 2022, one of 92 stations in Nevada with a 2022 open date. The station's record was last updated at the source on Aug 11, 2026.

Frequently asked questions

How many chargers does Home2 Suites by Hilton Reno have?

Home2 Suites by Hilton Reno has 2 charging ports: 2 Level 2.

Does Home2 Suites by Hilton Reno have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Home2 Suites by Hilton Reno have?

Home2 Suites by Hilton Reno has NACS (Tesla) connectors.

Is charging at Home2 Suites by Hilton Reno free?

Pricing as reported to the DOE registry: Free.

Is Home2 Suites by Hilton Reno open to the public?

Yes. Home2 Suites by Hilton Reno is listed with public access, and its status is available.

Where is Home2 Suites by Hilton Reno?

Home2 Suites by Hilton Reno is at 1111 Meadowood Mall Link, Reno, NV 89502. Its coordinates are 39.47605, -119.78649.

More EV charging around Reno

Working with Nevada charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 218644, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Home2 Suites by Hilton Reno, Reno, NV (AFDC station 218644)”, https://chargecensus.com/stations/nevada/home2-suites-by-hilton-reno-218644 (data as of October 12, 2026).