ChargeCensus

Wayne, Ne Wayne City Hall

Available

EV charging station in Wayne, Nebraska on the ChargePoint network — 1 Level 2. US DOE AFDC station 390575.

At a glance

Wayne, Ne Wayne City Hall is a public EV charging station at 513 Main St in Wayne, Nebraska, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 22, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
Location

Station record

DOE registry record

FieldValue
AFDC station ID390575
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 22, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
513 Main St
City
Wayne
ZIP
68787
Coordinates
42.23389, -97.01745

Within ~15 km

Nearby charging

No other registered stations within ~15 km.

What kind of charging does Wayne, Ne Wayne City Hall offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 58% below the Nebraska average of 2.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Wayne, Ne Wayne City Hall compare with other stations in Wayne?

Wayne has 1 charging station in the DOE registry with 1 ports. It is the only ChargePoint station in Wayne. Statewide, Nebraska has 349 stations and 826 ports, the 40th-largest station count of the 51 states and DC. The biggest station in Nebraska, Omaha, NE - Tesla Supercharger in Omaha, has 12 ports.

Who operates Wayne, Ne Wayne City Hall?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 254 of those stations are in Nebraska, 73% of the state's 349.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 22, 2025, one of 37 stations in Nebraska with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wayne, Ne Wayne City Hall have?

Wayne, Ne Wayne City Hall has 1 charging port: 1 Level 2.

Does Wayne, Ne Wayne City Hall have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Wayne, Ne Wayne City Hall have?

Wayne, Ne Wayne City Hall has J1772 connectors.

Is Wayne, Ne Wayne City Hall open to the public?

Yes. Wayne, Ne Wayne City Hall is listed with public access, and its status is available.

Where is Wayne, Ne Wayne City Hall?

Wayne, Ne Wayne City Hall is at 513 Main St, Wayne, NE 68787. Its coordinates are 42.23389, -97.01745.

More EV charging around Wayne

Working with Nebraska charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 390575, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wayne, Ne Wayne City Hall, Wayne, NE (AFDC station 390575)”, https://chargecensus.com/stations/nebraska/wayne-ne-wayne-city-hall-390575 (data as of October 12, 2026).