ChargeCensus

Sid Dillon Chevrolet Blair Inc.

Available

EV charging station in Blair, Nebraska on the EV Connect network — 2 DC fast · 1 Level 2. US DOE AFDC station 310859.

Total ports
3
DC fast
2
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 5 nearby

Station record

DOE registry record

FieldValue
AFDC station ID310859
NetworkEV Connect
StatusAvailable (E)
AccessPublic
Open dateSep 16, 2023
Last updated at sourceJul 23, 2026

Plugs

Connectors & pricing

  • J1772The standard Level 1/2 AC connector.
  • CCSCombined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry — check the network app for current rates.

Charging network

EV Connect

Operates 1,608 stations in the DOE registry — view the full network →

Location

Address
2261 S Hwy 30
City
Blair
ZIP
68008
Coordinates
41.52305, -96.14499

Within ~15 km

Nearby charging

Frequently asked questions

How many chargers does Sid Dillon Chevrolet Blair Inc. have?

The station has 3 charging ports: 2 DC fast · 1 Level 2.

What connectors does Sid Dillon Chevrolet Blair Inc. have?

Available connectors: J1772, CCS.

Is charging at Sid Dillon Chevrolet Blair Inc. free?

No pricing is listed in the DOE registry for this station — check the EV Connect app for current rates.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 310859, weekly full pull.