Hastings Ford
AvailableEV charging station in Hastings, Nebraska on the EV Connect network — 4 DC fast · 4 Level 2. US DOE AFDC station 313810.
At a glance
Hastings Ford is a public EV charging station at 3101 Osborne Dr W NE in Hastings, Nebraska, on the EV Connect network. It has 8 charging ports (4 DC fast · 4 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Oct 17, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 313810 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 17, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3101 Osborne Dr W NE
- City
- Hastings
- State
- Nebraska
- ZIP
- 68901
- Coordinates
- 40.61713, -98.38527
Within ~15 km
Nearby charging
- Central Cc Ccc - Hastings2 ports
ChargePoint · Available
ChargePoint · Available
- Jerry Spady Chevrolet GMC1 ports
EV Connect · Available
What kind of charging does Hastings Ford offer?
Of its 8 ports, 4 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.4 times the Nebraska average of 2.4 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does Hastings Ford compare with other stations in Hastings?
Hastings has 4 charging stations in the DOE registry with 13 ports, the 21st-most of 60 cities and towns in Nebraska. Hastings Ford accounts for 62% of the charging ports in Hastings. EV Connect runs 2 stations in Hastings. Statewide, Nebraska has 349 stations and 826 ports, the 40th-largest station count of the 51 states and DC. The biggest station in Nebraska, Omaha, NE - Tesla Supercharger in Omaha, has 12 ports.
Who operates Hastings Ford?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 8 of those stations are in Nebraska, 2% of the state's 349.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 17, 2023, one of 48 stations in Nebraska with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Hastings Ford have?
Hastings Ford has 8 charging ports: 4 DC fast · 4 Level 2.
Does Hastings Ford have DC fast charging?
Yes. The registry lists 4 DC fast ports at Hastings Ford, with CCS connectors.
What connectors does Hastings Ford have?
Hastings Ford has J1772 and CCS connectors.
Is Hastings Ford open to the public?
Yes. Hastings Ford is listed with public access, and its status is available.
Where is Hastings Ford?
Hastings Ford is at 3101 Osborne Dr W NE, Hastings, NE 68901. Its coordinates are 40.61713, -98.38527.
More EV charging around Hastings
Working with Nebraska charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 313810, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hastings Ford, Hastings, NE (AFDC station 313810)”, https://chargecensus.com/stations/nebraska/hastings-ford-313810 (data as of October 12, 2026).