The Diamond The Diamond S
AvailableEV charging station in Parkville, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 302735.
At a glance
The Diamond The Diamond S is a public EV charging station at 16100 Round Tripper Drive in Parkville, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 18, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 302735 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 18, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 16100 Round Tripper Drive
- City
- Parkville
- State
- Missouri
- ZIP
- 64152
- Coordinates
- 39.19489, -94.68269
Within ~15 km
Nearby charging
- century towers kcfd12 ports
AmpUp · Available
- Thoroughbred Ford11 ports
Synergev · Available
Tesla Destination · Available
- Victory Ford8 ports
Red E · Available
Tesla Supercharger · Available
- Harrah's Kansas City6 ports
Non-networked · Available
What kind of charging does The Diamond The Diamond S offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Diamond The Diamond S compare with other stations in Parkville?
Parkville has 4 charging stations in the DOE registry with 12 ports. The Diamond The Diamond S accounts for 17% of the charging ports in Parkville. ChargePoint runs 3 stations in Parkville. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates The Diamond The Diamond S?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 18, 2023, one of 226 stations in Missouri with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Diamond The Diamond S have?
The Diamond The Diamond S has 2 charging ports: 2 Level 2.
Does The Diamond The Diamond S have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Diamond The Diamond S have?
The Diamond The Diamond S has J1772 connectors.
Is The Diamond The Diamond S open to the public?
Yes. The Diamond The Diamond S is listed with public access, and its status is available.
Where is The Diamond The Diamond S?
The Diamond The Diamond S is at 16100 Round Tripper Drive, Parkville, MO 64152. Its coordinates are 39.19489, -94.68269.
More EV charging around Parkville
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 302735, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Diamond The Diamond S, Parkville, MO (AFDC station 302735)”, https://chargecensus.com/stations/missouri/the-diamond-the-diamond-s-302735 (data as of October 12, 2026).