Stamping Plant
AvailableEV charging station in N/A, Missouri on the Abm network — 2 Level 2. US DOE AFDC station 352229.
At a glance
Stamping Plant is a public EV charging station at Garrison Rd in N/A, Missouri, on the Abm network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 8, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 352229 |
| Network | Abm |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 8, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- Garrison Rd
- City
- N/A
- State
- Missouri
- ZIP
- 64068
- Coordinates
- 39.20837, -94.47128
Within ~15 km
Nearby charging
- century towers kcfd12 ports
AmpUp · Available
- Gary Crossley Ford9 ports
Synergev · Available
Tesla Destination · Available
Tesla Supercharger · Available
- Kansas City6 ports
Noodoe · Available
- Harrah's Kansas City6 ports
Non-networked · Available
What kind of charging does Stamping Plant offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Stamping Plant compare with other stations in N/A?
N/A has 1 charging station in the DOE registry with 2 ports. It is the only Abm station in N/A. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Stamping Plant?
Abm operates 59 stations in the registry across 20 states, with 45 DC fast and 312 Level 2 ports in total. 1 of those stations are in Missouri, under 1% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 8, 2024, one of 151 stations in Missouri with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Stamping Plant have?
Stamping Plant has 2 charging ports: 2 Level 2.
Does Stamping Plant have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Stamping Plant have?
Stamping Plant has J1772 connectors.
Is Stamping Plant open to the public?
Yes. Stamping Plant is listed with public access, and its status is available.
Where is Stamping Plant?
Stamping Plant is at Garrison Rd, N/A, MO 64068. Its coordinates are 39.20837, -94.47128.
More EV charging around N/A
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 352229, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Stamping Plant, N/A, MO (AFDC station 352229)”, https://chargecensus.com/stations/missouri/stamping-plant-352229 (data as of October 12, 2026).