ChargeCensus

Stamping Plant

Available

EV charging station in N/A, Missouri on the Abm network — 2 Level 2. US DOE AFDC station 352229.

At a glance

Stamping Plant is a public EV charging station at Garrison Rd in N/A, Missouri, on the Abm network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 8, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID352229
NetworkAbm
StatusAvailable (E)
AccessPublic
Open dateAug 8, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Abm

Operates 59 stations in the DOE registry — view the full network →

Location

Address
Garrison Rd
City
N/A
ZIP
64068
Coordinates
39.20837, -94.47128

Within ~15 km

Nearby charging

What kind of charging does Stamping Plant offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Stamping Plant compare with other stations in N/A?

N/A has 1 charging station in the DOE registry with 2 ports. It is the only Abm station in N/A. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Stamping Plant?

Abm operates 59 stations in the registry across 20 states, with 45 DC fast and 312 Level 2 ports in total. 1 of those stations are in Missouri, under 1% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 8, 2024, one of 151 stations in Missouri with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Stamping Plant have?

Stamping Plant has 2 charging ports: 2 Level 2.

Does Stamping Plant have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Stamping Plant have?

Stamping Plant has J1772 connectors.

Is Stamping Plant open to the public?

Yes. Stamping Plant is listed with public access, and its status is available.

Where is Stamping Plant?

Stamping Plant is at Garrison Rd, N/A, MO 64068. Its coordinates are 39.20837, -94.47128.

More EV charging around N/A

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 352229, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Stamping Plant, N/A, MO (AFDC station 352229)”, https://chargecensus.com/stations/missouri/stamping-plant-352229 (data as of October 12, 2026).