Southfield Center
AvailableEV charging station in Saint Louis, Missouri on the EVgo network — 4 DC fast. US DOE AFDC station 373059.
At a glance
Southfield Center is a public EV charging station at 5400 Southfield Center in Saint Louis, Missouri, on the EVgo network. It has 4 charging ports (4 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Dec 14, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 373059 |
| Network | EVgo |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 14, 2024 |
| Last updated at source | Oct 11, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5400 Southfield Center
- City
- Saint Louis
- State
- Missouri
- ZIP
- 63123
- Coordinates
- 38.52513, -90.35970
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
IONNA · Available
- Mission Hills HQ8 ports
Noodoe · Available
Tesla Supercharger · Available
What kind of charging does Southfield Center offer?
Of its 4 ports, 4 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 62% above the Missouri average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Southfield Center compare with other stations in Saint Louis?
Saint Louis has 13 charging stations in the DOE registry with 43 ports, the 19th-most of 162 cities and towns in Missouri. Southfield Center accounts for 9% of the charging ports in Saint Louis. EVgo runs 2 stations in Saint Louis. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Southfield Center?
DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 27 of those stations are in Missouri, 2% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 14, 2024, one of 151 stations in Missouri with a 2024 open date. The station's record was last updated at the source on Oct 11, 2026.
Frequently asked questions
How many chargers does Southfield Center have?
Southfield Center has 4 charging ports: 4 DC fast.
Does Southfield Center have DC fast charging?
Yes. The registry lists 4 DC fast ports at Southfield Center, with CHAdeMO and CCS connectors.
What connectors does Southfield Center have?
Southfield Center has CHAdeMO and CCS connectors.
Is Southfield Center open to the public?
Yes. Southfield Center is listed with public access, and its status is available.
Where is Southfield Center?
Southfield Center is at 5400 Southfield Center, Saint Louis, MO 63123. Its coordinates are 38.52513, -90.35970.
More EV charging around Saint Louis
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 373059, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Southfield Center, Saint Louis, MO (AFDC station 373059)”, https://chargecensus.com/stations/missouri/southfield-center-373059 (data as of October 12, 2026).