Schnucks Cape-L2
AvailableEV charging station in Cape Girardeau, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 168214.
At a glance
Schnucks Cape-L2 is a public EV charging station at 19 S Kingshighway St in Cape Girardeau, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 8, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 168214 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 8, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 19 S Kingshighway St
- City
- Cape Girardeau
- State
- Missouri
- ZIP
- 63703
- Coordinates
- 37.30516, -89.55225
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Destination · Available
Tesla Destination · Available
- Cape Branch Cape Branch2 ports
ChargePoint · Available
- Acees 315 Route K2 ports
Red E · Available
- Acees 310 Perryville2 ports
Red E · Temporarily unavailable
What kind of charging does Schnucks Cape-L2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Schnucks Cape-L2 compare with other stations in Cape Girardeau?
Cape Girardeau has 13 charging stations in the DOE registry with 37 ports, the 18th-most of 162 cities and towns in Missouri. Schnucks Cape-L2 accounts for 5% of the charging ports in Cape Girardeau. ChargePoint runs 7 stations in Cape Girardeau. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Schnucks Cape-L2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 8, 2020, one of 66 stations in Missouri with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Schnucks Cape-L2 have?
Schnucks Cape-L2 has 2 charging ports: 2 Level 2.
Does Schnucks Cape-L2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Schnucks Cape-L2 have?
Schnucks Cape-L2 has J1772 connectors.
Is Schnucks Cape-L2 open to the public?
Yes. Schnucks Cape-L2 is listed with public access, and its status is available.
Where is Schnucks Cape-L2?
Schnucks Cape-L2 is at 19 S Kingshighway St, Cape Girardeau, MO 63703. Its coordinates are 37.30516, -89.55225.
More EV charging around Cape Girardeau
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 168214, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Schnucks Cape-L2, Cape Girardeau, MO (AFDC station 168214)”, https://chargecensus.com/stations/missouri/schnucks-cape-l2-168214 (data as of October 12, 2026).