Premier Design Group
AvailableEV charging station in Wentzville, Missouri on the Blink network — 2 Level 2. US DOE AFDC station 255271.
At a glance
Premier Design Group is a public EV charging station at 100 Midland Park Drive in Wentzville, Missouri, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 15, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 255271 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 15, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 Midland Park Drive
- City
- Wentzville
- State
- Missouri
- ZIP
- 63385
- Coordinates
- 38.80549, -90.77822
Within ~15 km
Nearby charging
- Streets of Caledonia10 ports
Noodoe · Available
Tesla Supercharger · Available
- Walmart EV Charging8 ports
Walmart · Available
Electrify America · Available
- Verizon - Weldon Spring4 ports
Non-networked · Available
- Cottleville4 ports
evGateway · Available
What kind of charging does Premier Design Group offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Premier Design Group compare with other stations in Wentzville?
Wentzville has 4 charging stations in the DOE registry with 6 ports. Premier Design Group accounts for 33% of the charging ports in Wentzville. Blink runs 2 stations in Wentzville. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Premier Design Group?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 64 of those stations are in Missouri, 5% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 15, 2022, one of 88 stations in Missouri with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Premier Design Group have?
Premier Design Group has 2 charging ports: 2 Level 2.
Does Premier Design Group have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Premier Design Group have?
Premier Design Group has J1772 connectors.
Is Premier Design Group open to the public?
Yes. Premier Design Group is listed with public access, and its status is available.
Where is Premier Design Group?
Premier Design Group is at 100 Midland Park Drive, Wentzville, MO 63385. Its coordinates are 38.80549, -90.77822.
More EV charging around Wentzville
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 255271, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Premier Design Group, Wentzville, MO (AFDC station 255271)”, https://chargecensus.com/stations/missouri/premier-design-group-255271 (data as of October 12, 2026).