ChargeCensus

Mo 35 & 36 Shell Dc2

Available

EV charging station in Cameron, Missouri on the ChargePoint network — 1 DC fast. US DOE AFDC station 215037.

At a glance

Mo 35 & 36 Shell Dc2 is a public EV charging station at 1514 Bob F Griffin Rd in Cameron, Missouri, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Apr 27, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 2 nearby

Station record

DOE registry record

FieldValue
AFDC station ID215037
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 27, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1514 Bob F Griffin Rd
City
Cameron
ZIP
64429
Coordinates
39.75199, -94.21525

Within ~15 km

Nearby charging

What kind of charging does Mo 35 & 36 Shell Dc2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% below the Missouri average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Mo 35 & 36 Shell Dc2 compare with other stations in Cameron?

Cameron has 3 charging stations in the DOE registry with 4 ports. Mo 35 & 36 Shell Dc2 accounts for 25% of the charging ports in Cameron. ChargePoint runs 3 stations in Cameron. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Mo 35 & 36 Shell Dc2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 27, 2022, one of 88 stations in Missouri with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Mo 35 & 36 Shell Dc2 have?

Mo 35 & 36 Shell Dc2 has 1 charging port: 1 DC fast.

Does Mo 35 & 36 Shell Dc2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Mo 35 & 36 Shell Dc2, with CHAdeMO and CCS connectors.

What connectors does Mo 35 & 36 Shell Dc2 have?

Mo 35 & 36 Shell Dc2 has CHAdeMO and CCS connectors.

Is Mo 35 & 36 Shell Dc2 open to the public?

Yes. Mo 35 & 36 Shell Dc2 is listed with public access, and its status is available.

Where is Mo 35 & 36 Shell Dc2?

Mo 35 & 36 Shell Dc2 is at 1514 Bob F Griffin Rd, Cameron, MO 64429. Its coordinates are 39.75199, -94.21525.

More EV charging around Cameron

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 215037, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mo 35 & 36 Shell Dc2, Cameron, MO (AFDC station 215037)”, https://chargecensus.com/stations/missouri/mo-35-36-shell-dc2-215037 (data as of October 12, 2026).