EV charging station in Saint Louis, Missouri on the Blink network — 2 Level 2. US DOE AFDC station 309085.

At a glance

Maryville University - North Lot is a public EV charging station at 650 Maryville University Drive in Saint Louis, Missouri, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 6, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID309085
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJul 6, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
650 Maryville University Drive
ZIP
63141
Coordinates
38.64706, -90.50466

Within ~15 km

Nearby charging

What kind of charging does Maryville University - North Lot offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Maryville University - North Lot compare with other stations in Saint Louis?

Saint Louis has 13 charging stations in the DOE registry with 43 ports, the 19th-most of 162 cities and towns in Missouri. Maryville University - North Lot accounts for 5% of the charging ports in Saint Louis. Blink runs 6 stations in Saint Louis. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Maryville University - North Lot?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 64 of those stations are in Missouri, 5% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 6, 2023, one of 226 stations in Missouri with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Maryville University - North Lot have?

Maryville University - North Lot has 2 charging ports: 2 Level 2.

Does Maryville University - North Lot have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Maryville University - North Lot have?

Maryville University - North Lot has J1772 connectors.

Is Maryville University - North Lot open to the public?

Yes. Maryville University - North Lot is listed with public access, and its status is available.

Where is Maryville University - North Lot?

Maryville University - North Lot is at 650 Maryville University Drive, Saint Louis, MO 63141. Its coordinates are 38.64706, -90.50466.

More EV charging around Saint Louis

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 309085, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Maryville University - North Lot, Saint Louis, MO (AFDC station 309085)”, https://chargecensus.com/stations/missouri/maryville-university-north-lot-309085 (data as of October 12, 2026).