Liberty Utilities - DTWN Joplin
AvailableEV charging station in Joplin, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 77187.
At a glance
Liberty Utilities - DTWN Joplin is a public EV charging station at 602 S Joplin St in Joplin, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 20, 2016.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 77187 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Facility | Utility |
| Open date | Jul 20, 2016 |
| Last updated at source | Sep 14, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Discount Express4 ports
AmpUp · Available
Tesla Destination · Available
- Pilot Travel Center 6694 ports
EVgo · Available
- Frank Fletcher Ford4 ports
Ford Charge · Available
What kind of charging does Liberty Utilities - DTWN Joplin offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a utility location.
How does Liberty Utilities - DTWN Joplin compare with other stations in Joplin?
Joplin has 30 charging stations in the DOE registry with 87 ports, the 4th-most of 162 cities and towns in Missouri. Liberty Utilities - DTWN Joplin accounts for 2% of the charging ports in Joplin. ChargePoint runs 21 stations in Joplin. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Liberty Utilities - DTWN Joplin?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 20, 2016, one of 38 stations in Missouri with a 2016 open date. The station's record was last updated at the source on Sep 14, 2026.
Frequently asked questions
How many chargers does Liberty Utilities - DTWN Joplin have?
Liberty Utilities - DTWN Joplin has 2 charging ports: 2 Level 2.
Does Liberty Utilities - DTWN Joplin have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Liberty Utilities - DTWN Joplin have?
Liberty Utilities - DTWN Joplin has J1772 connectors.
Is Liberty Utilities - DTWN Joplin open to the public?
Yes. Liberty Utilities - DTWN Joplin is listed with public access, and its status is available.
Where is Liberty Utilities - DTWN Joplin?
Liberty Utilities - DTWN Joplin is at 602 S Joplin St, Joplin, MO 64801. Its coordinates are 37.08429, -94.51567.
More EV charging around Joplin
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 77187, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Liberty Utilities - DTWN Joplin, Joplin, MO (AFDC station 77187)”, https://chargecensus.com/stations/missouri/liberty-utilities-dtwn-joplin-77187 (data as of October 12, 2026).