Liberty Empire Bolivarsvccntr2
AvailableEV charging station in Bolivar, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 170275.
At a glance
Liberty Empire Bolivarsvccntr2 is a public EV charging station at 2715 W Broadway St in Bolivar, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 18, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 170275 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 18, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2715 W Broadway St
- City
- Bolivar
- State
- Missouri
- ZIP
- 65613
- Coordinates
- 37.61200, -93.44072
Within ~15 km
Nearby charging
Tesla Destination · Available
ChargePoint · Available
ChargePoint · Available
- Cmh Hospital 1500 N Oak S#22 ports
ChargePoint · Available
- Cmh Hospital 1500 N Oak S#12 ports
ChargePoint · Available
ChargePoint · Available
What kind of charging does Liberty Empire Bolivarsvccntr2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Liberty Empire Bolivarsvccntr2 compare with other stations in Bolivar?
Bolivar has 6 charging stations in the DOE registry with 14 ports. Liberty Empire Bolivarsvccntr2 accounts for 14% of the charging ports in Bolivar. ChargePoint runs 5 stations in Bolivar. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Liberty Empire Bolivarsvccntr2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 18, 2020, one of 66 stations in Missouri with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Liberty Empire Bolivarsvccntr2 have?
Liberty Empire Bolivarsvccntr2 has 2 charging ports: 2 Level 2.
Does Liberty Empire Bolivarsvccntr2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Liberty Empire Bolivarsvccntr2 have?
Liberty Empire Bolivarsvccntr2 has J1772 connectors.
Is Liberty Empire Bolivarsvccntr2 open to the public?
Yes. Liberty Empire Bolivarsvccntr2 is listed with public access, and its status is available.
Where is Liberty Empire Bolivarsvccntr2?
Liberty Empire Bolivarsvccntr2 is at 2715 W Broadway St, Bolivar, MO 65613. Its coordinates are 37.61200, -93.44072.
More EV charging around Bolivar
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 170275, weekly full pull.