Evergy @Walmart -063b
AvailableEV charging station in Maryville, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 70758.
At a glance
Evergy @Walmart -063b is a public EV charging station at 1605 S Main St @ Walmart #801 in Maryville, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 30, 2015.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 70758 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 30, 2015 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1605 S Main St @ Walmart #801
- City
- Maryville
- State
- Missouri
- ZIP
- 64468
- Coordinates
- 40.33088, -94.87122
Within ~15 km
Nearby charging
- Casey's - Maryville6 ports
Francis Energy · Available
- Evergy @Walmart -063a2 ports
ChargePoint · Available
- Evergy @Walmart -063c2 ports
ChargePoint · Available
- Holiday Inn Express2 ports
Turnongreen · Available
- Evergy @Nwmsu -312b2 ports
ChargePoint · Available
- Evergy @Nwmsu -312a2 ports
ChargePoint · Available
What kind of charging does Evergy @Walmart -063b offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Evergy @Walmart -063b compare with other stations in Maryville?
Maryville has 8 charging stations in the DOE registry with 20 ports. Evergy @Walmart -063b accounts for 10% of the charging ports in Maryville. ChargePoint runs 6 stations in Maryville. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Evergy @Walmart -063b?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 30, 2015, one of 29 stations in Missouri with a 2015 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Evergy @Walmart -063b have?
Evergy @Walmart -063b has 2 charging ports: 2 Level 2.
Does Evergy @Walmart -063b have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Evergy @Walmart -063b have?
Evergy @Walmart -063b has J1772 connectors.
Is Evergy @Walmart -063b open to the public?
Yes. Evergy @Walmart -063b is listed with public access, and its status is available.
Where is Evergy @Walmart -063b?
Evergy @Walmart -063b is at 1605 S Main St @ Walmart #801, Maryville, MO 64468. Its coordinates are 40.33088, -94.87122.
More EV charging around Maryville
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 70758, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Evergy @Walmart -063b, Maryville, MO (AFDC station 70758)”, https://chargecensus.com/stations/missouri/evergy-walmart-063b-70758 (data as of October 12, 2026).