Evergy @Walmart -059b
AvailableEV charging station in Richmond, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 172148.
At a glance
Evergy @Walmart -059b is a public EV charging station at 908 Walton Way @ Walmart #325 in Richmond, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 172148 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 908 Walton Way @ Walmart #325
- City
- Richmond
- State
- Missouri
- ZIP
- 64085
- Coordinates
- 39.26410, -93.96185
Within ~15 km
Nearby charging
- Evergy @Walmart -059a2 ports
ChargePoint · Available
- Evergy @Bb Theatr-225b2 ports
ChargePoint · Available
- Evergy @Bb Theatr-225a2 ports
ChargePoint · Available
- Evergy @Tour Bur-223a2 ports
ChargePoint · Available
- Evergy @Tour Bur-223b2 ports
ChargePoint · Available
- Evergy @Library -224a2 ports
ChargePoint · Available
What kind of charging does Evergy @Walmart -059b offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Evergy @Walmart -059b compare with other stations in Richmond?
Richmond has 4 charging stations in the DOE registry with 8 ports. Evergy @Walmart -059b accounts for 25% of the charging ports in Richmond. ChargePoint runs 3 stations in Richmond. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Evergy @Walmart -059b?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 447 stations in Missouri with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Evergy @Walmart -059b have?
Evergy @Walmart -059b has 2 charging ports: 2 Level 2.
Does Evergy @Walmart -059b have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Evergy @Walmart -059b have?
Evergy @Walmart -059b has J1772 connectors.
Is Evergy @Walmart -059b open to the public?
Yes. Evergy @Walmart -059b is listed with public access, and its status is available.
Where is Evergy @Walmart -059b?
Evergy @Walmart -059b is at 908 Walton Way @ Walmart #325, Richmond, MO 64085. Its coordinates are 39.26410, -93.96185.
More EV charging around Richmond
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 172148, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Evergy @Walmart -059b, Richmond, MO (AFDC station 172148)”, https://chargecensus.com/stations/missouri/evergy-walmart-059b-172148 (data as of October 12, 2026).