Evergy @N Hmptn-508
AvailableEV charging station in Kansas City, Missouri on the ChargePoint network — 1 Level 2. US DOE AFDC station 260395.
At a glance
Evergy @N Hmptn-508 is a public EV charging station at 11422 N Kentucky Ave '@N Hampton Park in Kansas City, Missouri, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 6, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 260395 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 6, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 11422 N Kentucky Ave '@N Hampton Park
- City
- Kansas City
- State
- Missouri
- ZIP
- 64157
- Coordinates
- 39.30010, -94.47179
Within ~15 km
Nearby charging
- Gary Crossley Ford9 ports
Synergev · Available
Tesla Supercharger · Available
- Kansas City6 ports
Noodoe · Available
IONNA · Available
- Pilot Travel Center 11264 ports
EVgo · Available
- KCFD Fire Station #144 ports
AmpUp · Available
What kind of charging does Evergy @N Hmptn-508 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 60% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Evergy @N Hmptn-508 compare with other stations in Kansas City?
Kansas City has 477 charging stations in the DOE registry with 958 ports, the most of 162 cities and towns in Missouri. Evergy @N Hmptn-508 accounts for under 1% of the charging ports in Kansas City. ChargePoint runs 427 stations in Kansas City. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Evergy @N Hmptn-508?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 6, 2023, one of 226 stations in Missouri with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Evergy @N Hmptn-508 have?
Evergy @N Hmptn-508 has 1 charging port: 1 Level 2.
Does Evergy @N Hmptn-508 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Evergy @N Hmptn-508 have?
Evergy @N Hmptn-508 has J1772 connectors.
Is Evergy @N Hmptn-508 open to the public?
Yes. Evergy @N Hmptn-508 is listed with public access, and its status is available.
Where is Evergy @N Hmptn-508?
Evergy @N Hmptn-508 is at 11422 N Kentucky Ave '@N Hampton Park, Kansas City, MO 64157. Its coordinates are 39.30010, -94.47179.
More EV charging around Kansas City
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 260395, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Evergy @N Hmptn-508, Kansas City, MO (AFDC station 260395)”, https://chargecensus.com/stations/missouri/evergy-n-hmptn-508-260395 (data as of October 12, 2026).