ChargeCensus

Evergy @Hy-Vee -004a

Available

EV charging station in Kansas City, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 172469.

At a glance

Evergy @Hy-Vee -004a is a public EV charging station at 5330 NW 64th St @ Hy-Vee #3 in Kansas City, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID172469
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5330 NW 64th St @ Hy-Vee #3
ZIP
64151
Coordinates
39.21077, -94.64252

Within ~15 km

Nearby charging

What kind of charging does Evergy @Hy-Vee -004a offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Evergy @Hy-Vee -004a compare with other stations in Kansas City?

Kansas City has 477 charging stations in the DOE registry with 958 ports, the most of 162 cities and towns in Missouri. Evergy @Hy-Vee -004a accounts for under 1% of the charging ports in Kansas City. ChargePoint runs 427 stations in Kansas City. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Evergy @Hy-Vee -004a?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 447 stations in Missouri with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Evergy @Hy-Vee -004a have?

Evergy @Hy-Vee -004a has 2 charging ports: 2 Level 2.

Does Evergy @Hy-Vee -004a have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Evergy @Hy-Vee -004a have?

Evergy @Hy-Vee -004a has J1772 connectors.

Is Evergy @Hy-Vee -004a open to the public?

Yes. Evergy @Hy-Vee -004a is listed with public access, and its status is available.

Where is Evergy @Hy-Vee -004a?

Evergy @Hy-Vee -004a is at 5330 NW 64th St @ Hy-Vee #3, Kansas City, MO 64151. Its coordinates are 39.21077, -94.64252.

More EV charging around Kansas City

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 172469, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Evergy @Hy-Vee -004a, Kansas City, MO (AFDC station 172469)”, https://chargecensus.com/stations/missouri/evergy-hy-vee-004a-172469 (data as of October 12, 2026).