ChargeCensus

Evergy @City Hall-114a

Available

EV charging station in Clinton, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 172135.

At a glance

Evergy @City Hall-114a is a public EV charging station at 105 E Ohio St @ City Hall in Clinton, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID172135
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
105 E Ohio St @ City Hall
City
Clinton
ZIP
64735
Coordinates
38.36695, -93.77555

Within ~15 km

Nearby charging

What kind of charging does Evergy @City Hall-114a offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Evergy @City Hall-114a compare with other stations in Clinton?

Clinton has 4 charging stations in the DOE registry with 12 ports. Evergy @City Hall-114a accounts for 17% of the charging ports in Clinton. ChargePoint runs 3 stations in Clinton. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Evergy @City Hall-114a?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 447 stations in Missouri with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Evergy @City Hall-114a have?

Evergy @City Hall-114a has 2 charging ports: 2 Level 2.

Does Evergy @City Hall-114a have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Evergy @City Hall-114a have?

Evergy @City Hall-114a has J1772 connectors.

Is Evergy @City Hall-114a open to the public?

Yes. Evergy @City Hall-114a is listed with public access, and its status is available.

Where is Evergy @City Hall-114a?

Evergy @City Hall-114a is at 105 E Ohio St @ City Hall, Clinton, MO 64735. Its coordinates are 38.36695, -93.77555.

More EV charging around Clinton

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 172135, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Evergy @City Hall-114a, Clinton, MO (AFDC station 172135)”, https://chargecensus.com/stations/missouri/evergy-city-hall-114a-172135 (data as of October 12, 2026).