ChargeCensus

Ejhq 110 South Charg

Available

EV charging station in Maryland Heights, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 462192.

At a glance

Ejhq 110 South Charg is a public EV charging station at 150 Edward Jones Blvd in Maryland Heights, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 25, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID462192
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 25, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
150 Edward Jones Blvd
ZIP
63043
Coordinates
38.71044, -90.44751

Within ~15 km

Nearby charging

What kind of charging does Ejhq 110 South Charg offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Ejhq 110 South Charg compare with other stations in Maryland Heights?

Maryland Heights has 10 charging stations in the DOE registry with 27 ports, the 23rd-most of 162 cities and towns in Missouri. Ejhq 110 South Charg accounts for 7% of the charging ports in Maryland Heights. ChargePoint runs 6 stations in Maryland Heights. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Ejhq 110 South Charg?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 25, 2026, one of 74 stations in Missouri with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Ejhq 110 South Charg have?

Ejhq 110 South Charg has 2 charging ports: 2 Level 2.

Does Ejhq 110 South Charg have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Ejhq 110 South Charg have?

Ejhq 110 South Charg has J1772 connectors.

Is Ejhq 110 South Charg open to the public?

Yes. Ejhq 110 South Charg is listed with public access, and its status is available.

Where is Ejhq 110 South Charg?

Ejhq 110 South Charg is at 150 Edward Jones Blvd, Maryland Heights, MO 63043. Its coordinates are 38.71044, -90.44751.

More EV charging around Maryland Heights

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 462192, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Ejhq 110 South Charg, Maryland Heights, MO (AFDC station 462192)”, https://chargecensus.com/stations/missouri/ejhq-110-south-charg-462192 (data as of October 12, 2026).