AvailableEV charging station in Cassville, Missouri on the ChargePoint network — 1 DC fast. US DOE AFDC station 330338.
At a glance
Dnr Msp Rr Dcfc Ev1 is a public EV charging station at 24667 State Hwy 112 in Cassville, Missouri, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 13, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 330338 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 13, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 24667 State Hwy 112
- City
- Cassville
- State
- Missouri
- ZIP
- 65625
- Coordinates
- 36.58286, -93.83755
Within ~15 km
Nearby charging
- Dnr Msp Rr Level 2ev42 ports
ChargePoint · Available
- Dnr Msp Rr Level 2ev32 ports
ChargePoint · Available
- Dnr Msp Rr Dcfc Ev21 ports
ChargePoint · Available
What kind of charging does Dnr Msp Rr Dcfc Ev1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% below the Missouri average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Dnr Msp Rr Dcfc Ev1 compare with other stations in Cassville?
Cassville has 4 charging stations in the DOE registry with 6 ports. Dnr Msp Rr Dcfc Ev1 accounts for 17% of the charging ports in Cassville. ChargePoint runs 4 stations in Cassville. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Dnr Msp Rr Dcfc Ev1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 13, 2024, one of 151 stations in Missouri with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dnr Msp Rr Dcfc Ev1 have?
Dnr Msp Rr Dcfc Ev1 has 1 charging port: 1 DC fast.
Does Dnr Msp Rr Dcfc Ev1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Dnr Msp Rr Dcfc Ev1, with CHAdeMO and CCS connectors.
What connectors does Dnr Msp Rr Dcfc Ev1 have?
Dnr Msp Rr Dcfc Ev1 has CHAdeMO and CCS connectors.
Is Dnr Msp Rr Dcfc Ev1 open to the public?
Yes. Dnr Msp Rr Dcfc Ev1 is listed with public access, and its status is available.
Where is Dnr Msp Rr Dcfc Ev1?
Dnr Msp Rr Dcfc Ev1 is at 24667 State Hwy 112, Cassville, MO 65625. Its coordinates are 36.58286, -93.83755.
More EV charging around Cassville
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 330338, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dnr Msp Rr Dcfc Ev1, Cassville, MO (AFDC station 330338)”, https://chargecensus.com/stations/missouri/dnr-msp-rr-dcfc-ev1-330338 (data as of October 12, 2026).