ChargeCensus

Dnr Msp Mont Dcfc Ev2

Available

EV charging station in Salem, Missouri on the ChargePoint network — 1 DC fast. US DOE AFDC station 330499.

At a glance

Dnr Msp Mont Dcfc Ev2 is a public EV charging station at 345 County Rd 6670 in Salem, Missouri, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Mar 14, 2024.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID330499
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 14, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
345 County Rd 6670
City
Salem
ZIP
65560
Coordinates
37.45188, -91.68173

Within ~15 km

Nearby charging

What kind of charging does Dnr Msp Mont Dcfc Ev2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% below the Missouri average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Dnr Msp Mont Dcfc Ev2 compare with other stations in Salem?

Salem has 4 charging stations in the DOE registry with 6 ports. Dnr Msp Mont Dcfc Ev2 accounts for 17% of the charging ports in Salem. ChargePoint runs 4 stations in Salem. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.

Who operates Dnr Msp Mont Dcfc Ev2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 14, 2024, one of 151 stations in Missouri with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Dnr Msp Mont Dcfc Ev2 have?

Dnr Msp Mont Dcfc Ev2 has 1 charging port: 1 DC fast.

Does Dnr Msp Mont Dcfc Ev2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Dnr Msp Mont Dcfc Ev2, with CHAdeMO and CCS connectors.

What connectors does Dnr Msp Mont Dcfc Ev2 have?

Dnr Msp Mont Dcfc Ev2 has CHAdeMO and CCS connectors.

Is Dnr Msp Mont Dcfc Ev2 open to the public?

Yes. Dnr Msp Mont Dcfc Ev2 is listed with public access, and its status is available.

Where is Dnr Msp Mont Dcfc Ev2?

Dnr Msp Mont Dcfc Ev2 is at 345 County Rd 6670, Salem, MO 65560. Its coordinates are 37.45188, -91.68173.

More EV charging around Salem

Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 330499, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Dnr Msp Mont Dcfc Ev2, Salem, MO (AFDC station 330499)”, https://chargecensus.com/stations/missouri/dnr-msp-mont-dcfc-ev2-330499 (data as of October 12, 2026).