Courtyard by Marriott
AvailableEV charging station in Kansas City, Missouri, not on a charging network — 1 Level 2. US DOE AFDC station 197508.
At a glance
Courtyard by Marriott is a public EV charging station at 4000 N Mulberry Dr in Kansas City, Missouri, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 4, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 197508 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Hotel |
| Open date | Oct 4, 2021 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 4000 N Mulberry Dr
- City
- Kansas City
- State
- Missouri
- ZIP
- 64116
- Coordinates
- 39.16583, -94.59534
Within ~15 km
Nearby charging
- Mission, KS - Tesla Supercharger20 ports
Tesla Supercharger · Available
- century towers kcfd12 ports
AmpUp · Available
- Thoroughbred Ford11 ports
Synergev · Available
- Gary Crossley Ford9 ports
Synergev · Available
Tesla Destination · Available
Electrify America · Available
What kind of charging does Courtyard by Marriott offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 60% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a hotel location.
How does Courtyard by Marriott compare with other stations in Kansas City?
Kansas City has 477 charging stations in the DOE registry with 958 ports, the most of 162 cities and towns in Missouri. Courtyard by Marriott accounts for under 1% of the charging ports in Kansas City. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Courtyard by Marriott?
Courtyard by Marriott is listed as non-networked: its chargers are not run through a charging-network account. Missouri has 93 non-networked stations, 7% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 4, 2021, one of 447 stations in Missouri with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Courtyard by Marriott have?
Courtyard by Marriott has 1 charging port: 1 Level 2.
Does Courtyard by Marriott have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Courtyard by Marriott have?
Courtyard by Marriott has J1772 connectors.
Is charging at Courtyard by Marriott free?
Pricing as reported to the DOE registry: Free.
Is Courtyard by Marriott open to the public?
Yes. Courtyard by Marriott is listed with public access, and its status is available.
Where is Courtyard by Marriott?
Courtyard by Marriott is at 4000 N Mulberry Dr, Kansas City, MO 64116. Its coordinates are 39.16583, -94.59534.
More EV charging around Kansas City
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 197508, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Courtyard by Marriott, Kansas City, MO (AFDC station 197508)”, https://chargecensus.com/stations/missouri/courtyard-by-marriott-197508 (data as of October 12, 2026).