Bt Front Lot 01
AvailableEV charging station in Poplar Bluff, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 330052.
At a glance
Bt Front Lot 01 is a public EV charging station at 801 South Westwood Boulevard in Poplar Bluff, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 8, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 330052 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 8, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 801 South Westwood Boulevard
- City
- Poplar Bluff
- State
- Missouri
- ZIP
- 63901
- Coordinates
- 36.75113, -90.41041
Within ~15 km
Nearby charging
Non-networked · Available
Francis Energy · Available
EV Connect · Available
- Baldwin Chevrolet Cadillac2 ports
EV Connect · Available
Non-networked · Available
Universal EV Chargers · Available
What kind of charging does Bt Front Lot 01 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bt Front Lot 01 compare with other stations in Poplar Bluff?
Poplar Bluff has 10 charging stations in the DOE registry with 25 ports, the 25th-most of 162 cities and towns in Missouri. Bt Front Lot 01 accounts for 8% of the charging ports in Poplar Bluff. It is the only ChargePoint station in Poplar Bluff. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Bt Front Lot 01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 8, 2024, one of 151 stations in Missouri with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bt Front Lot 01 have?
Bt Front Lot 01 has 2 charging ports: 2 Level 2.
Does Bt Front Lot 01 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bt Front Lot 01 have?
Bt Front Lot 01 has J1772 connectors.
Is Bt Front Lot 01 open to the public?
Yes. Bt Front Lot 01 is listed with public access, and its status is available.
Where is Bt Front Lot 01?
Bt Front Lot 01 is at 801 South Westwood Boulevard, Poplar Bluff, MO 63901. Its coordinates are 36.75113, -90.41041.
More EV charging around Poplar Bluff
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 330052, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bt Front Lot 01, Poplar Bluff, MO (AFDC station 330052)”, https://chargecensus.com/stations/missouri/bt-front-lot-01-330052 (data as of October 12, 2026).