Bjc Thanks You 1a-2
AvailableEV charging station in St. Louis, Missouri on the ChargePoint network — 2 Level 2. US DOE AFDC station 197614.
At a glance
Bjc Thanks You 1a-2 is a public EV charging station at 3 Barnes Jewish Hospital Plaza in St. Louis, Missouri, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 12, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 197614 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 12, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- St. Louis Union Station12 ports
Non-networked · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Cortex Innovation Community8 ports
AmpUp · Available
- Avenir Apartments8 ports
Blink · Available
What kind of charging does Bjc Thanks You 1a-2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 19% below the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bjc Thanks You 1a-2 compare with other stations in St. Louis?
St. Louis has 128 charging stations in the DOE registry with 354 ports, the 2nd-most of 162 cities and towns in Missouri. Bjc Thanks You 1a-2 accounts for under 1% of the charging ports in St. Louis. ChargePoint runs 63 stations in St. Louis. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Bjc Thanks You 1a-2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 12, 2021, one of 447 stations in Missouri with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bjc Thanks You 1a-2 have?
Bjc Thanks You 1a-2 has 2 charging ports: 2 Level 2.
Does Bjc Thanks You 1a-2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bjc Thanks You 1a-2 have?
Bjc Thanks You 1a-2 has J1772 connectors.
Is Bjc Thanks You 1a-2 open to the public?
Yes. Bjc Thanks You 1a-2 is listed with public access, and its status is available.
Where is Bjc Thanks You 1a-2?
Bjc Thanks You 1a-2 is at 3 Barnes Jewish Hospital Plaza, St. Louis, MO 63110. Its coordinates are 38.63477, -90.26499.
More EV charging around St. Louis
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 197614, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bjc Thanks You 1a-2, St. Louis, MO (AFDC station 197614)”, https://chargecensus.com/stations/missouri/bjc-thanks-you-1a-2-197614 (data as of October 12, 2026).