Aodcharger1 Aodcharger1
AvailableEV charging station in Columbia, Missouri on the ChargePoint network — 1 DC fast. US DOE AFDC station 429663.
At a glance
Aodcharger1 Aodcharger1 is a public EV charging station at 4525 Waco Rd in Columbia, Missouri, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Oct 10, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 429663 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 10, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Columbia, MO6 ports
Rivian Adventure Network · Available
Tesla Supercharger · Available
What kind of charging does Aodcharger1 Aodcharger1 offer?
Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 60% below the Missouri average of 2.5 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.
How does Aodcharger1 Aodcharger1 compare with other stations in Columbia?
Columbia has 20 charging stations in the DOE registry with 70 ports, the 8th-most of 162 cities and towns in Missouri. Aodcharger1 Aodcharger1 accounts for 1% of the charging ports in Columbia. ChargePoint runs 6 stations in Columbia. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates Aodcharger1 Aodcharger1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 976 of those stations are in Missouri, 69% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 10, 2025, one of 109 stations in Missouri with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Aodcharger1 Aodcharger1 have?
Aodcharger1 Aodcharger1 has 1 charging port: 1 DC fast.
Does Aodcharger1 Aodcharger1 have DC fast charging?
Yes. The registry lists 1 DC fast port at Aodcharger1 Aodcharger1, with CHAdeMO and CCS connectors.
What connectors does Aodcharger1 Aodcharger1 have?
Aodcharger1 Aodcharger1 has CHAdeMO and CCS connectors.
Is Aodcharger1 Aodcharger1 open to the public?
Yes. Aodcharger1 Aodcharger1 is listed with public access, and its status is available.
Where is Aodcharger1 Aodcharger1?
Aodcharger1 Aodcharger1 is at 4525 Waco Rd, Columbia, MO 65202. Its coordinates are 39.01237, -92.26780.
More EV charging around Columbia
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 429663, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Aodcharger1 Aodcharger1, Columbia, MO (AFDC station 429663)”, https://chargecensus.com/stations/missouri/aodcharger1-aodcharger1-429663 (data as of October 12, 2026).