150 E 19th
AvailableEV charging station in Mountain Grove, Missouri on the ChargeLab network — 8 Level 2. US DOE AFDC station 459804.
At a glance
150 E 19th is a public EV charging station at 150 E 19th in Mountain Grove, Missouri, on the ChargeLab network. It has 8 charging ports (8 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 16, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 459804 |
| Network | ChargeLab |
| Status | Available (E) |
| Access | Public |
| Open date | May 16, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 150 E 19th
- City
- Mountain Grove
- State
- Missouri
- ZIP
- 65711
- Coordinates
- 37.30306, -92.25366
Within ~15 km
Nearby charging
No other registered stations within ~15 km.
What kind of charging does 150 E 19th offer?
Of its 8 ports, 8 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.2 times the Missouri average of 2.5 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does 150 E 19th compare with other stations in Mountain Grove?
Mountain Grove has 1 charging station in the DOE registry with 8 ports. It is the only ChargeLab station in Mountain Grove. Statewide, Missouri has 1,416 stations and 3,505 ports, the 20th-largest station count of the 51 states and DC. The biggest station in Missouri, Joplin, MO - Highway 43 - Tesla Supercharger in Joplin, has 20 ports.
Who operates 150 E 19th?
ChargeLab operates 406 stations in the registry across 38 states, with 325 DC fast and 1,312 Level 2 ports in total. 10 of those stations are in Missouri, under 1% of the state's 1,416.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 16, 2026, one of 74 stations in Missouri with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does 150 E 19th have?
150 E 19th has 8 charging ports: 8 Level 2.
Does 150 E 19th have DC fast charging?
No. The registry lists no DC fast ports here; its 8 ports are all Level 2.
What connectors does 150 E 19th have?
150 E 19th has J1772 connectors.
Is 150 E 19th open to the public?
Yes. 150 E 19th is listed with public access, and its status is available.
Where is 150 E 19th?
150 E 19th is at 150 E 19th, Mountain Grove, MO 65711. Its coordinates are 37.30306, -92.25366.
More EV charging around Mountain Grove
Working with Missouri charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 459804, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “150 E 19th, Mountain Grove, MO (AFDC station 459804)”, https://chargecensus.com/stations/missouri/150-e-19th-459804 (data as of October 12, 2026).