Gray-Daniels Ford Lincoln
AvailableEV charging station in Brandon, Mississippi, not on a charging network — 1 Level 2. US DOE AFDC station 257704.
At a glance
Gray-Daniels Ford Lincoln is a public EV charging station at 201 Octavia Dr in Brandon, Mississippi, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 30, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 257704 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Car dealership |
| Open date | Mar 30, 2023 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 201 Octavia Dr
- City
- Brandon
- State
- Mississippi
- ZIP
- 39042
- Coordinates
- 32.28286, -90.03532
Within ~15 km
Nearby charging
- Paul Moak Volvo9 ports
Non-networked · Available
Tesla Destination · Available
Tesla Supercharger · Available
Tesla Destination · Available
- Gray Daniels Ford6 ports
ViaLynk · Available
Tesla Destination · Available
What kind of charging does Gray-Daniels Ford Lincoln offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 71% below the Mississippi average of 3.4 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a car dealership location.
How does Gray-Daniels Ford Lincoln compare with other stations in Brandon?
Brandon has 5 charging stations in the DOE registry with 13 ports, the 15th-most of 64 cities and towns in Mississippi. Gray-Daniels Ford Lincoln accounts for 8% of the charging ports in Brandon. Statewide, Mississippi has 258 stations and 876 ports, the 45th-largest station count of the 51 states and DC. The biggest station in Mississippi, Hattiesburg Ms Sdc in Hattiesburg, has 54 ports.
Who operates Gray-Daniels Ford Lincoln?
Gray-Daniels Ford Lincoln is listed as non-networked: its chargers are not run through a charging-network account. Mississippi has 63 non-networked stations, 24% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 30, 2023, one of 49 stations in Mississippi with a 2023 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Gray-Daniels Ford Lincoln have?
Gray-Daniels Ford Lincoln has 1 charging port: 1 Level 2.
Does Gray-Daniels Ford Lincoln have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Gray-Daniels Ford Lincoln have?
Gray-Daniels Ford Lincoln has J1772 connectors.
Is Gray-Daniels Ford Lincoln open to the public?
Yes. Gray-Daniels Ford Lincoln is listed with public access, and its status is available.
Where is Gray-Daniels Ford Lincoln?
Gray-Daniels Ford Lincoln is at 201 Octavia Dr, Brandon, MS 39042. Its coordinates are 32.28286, -90.03532.
More EV charging around Brandon
Working with Mississippi charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 257704, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Gray-Daniels Ford Lincoln, Brandon, MS (AFDC station 257704)”, https://chargecensus.com/stations/mississippi/gray-daniels-ford-lincoln-257704 (data as of October 12, 2026).